Main Title |
Evaluation of particulate matter (PM) continuous emission monitoring systems (CEMS) final report, volume 2 - appendices for initial correlation tests. |
Author |
Bivins, D.
|
Other Authors |
|
CORP Author |
Midwest Research Inst., Kansas City, MO.;Environmental Protection Agency, Research Triangle Park, NC. Office of Air Quality Planning and Standards. |
Publisher |
U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Emissions Monitoring and Analysis Division, Emissions Measurement Center, |
Year Published |
2000 |
Report Number |
EPA/454/R-00/040b; EPA-68-D-98-027; EPA/454/R-00/040B |
Stock Number |
PB2001-102597 |
Subjects |
Continuous emission monitoring ;
Air--Pollution--Measurement
|
Additional Subjects |
Air pollution monitoring ;
Particulates ;
Boilers ;
Flue gas ;
Scrubbers ;
Quality assurance ;
Field tests ;
Emissions ;
Air pollution monitors ;
Air pollution sampling ;
Air pollution control ;
Correlation ;
CEMS(Continuous Emission Monitoring Systems) ;
Continuous Emission Monitoring Systems
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB2001-102597 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
328 p. : ill., charts, facsims., plans ; 28 cm. |
Abstract |
This final report describes an extended field demonstration of three particulate matter (PM) continuous emission monitoring systems (CEMS) at a coal-fired boiler equipped with a lime slurry scrubber and baghouse for air pollution control. The primary objectives of the field study were to: (1) demonstrate whether the PM CEMS could provide reliable and accurate data over an extended period, (2) evaluate the PM CEMS for durability, data availability, and setup/maintenance requirements, and (3) determine whether the PM CEMS satisfy all the requirements of draft PS-11 and the quality assurance (QA) criteria specified in draft Procedure 2, or determine if changes are needed in the requirements of PS-11 and/or Procedure 2. This report presents the results of the study involving two different PM CEMS technologies (light scatter and beta gauge) at the coal-fired boiler. |
Notes |
"Volume 2 of 5 volumes." Cover title. EPA Project Officer: Dan Bivens. "September 2000." "MRI Project no. 104703.1.002.07.01" --P.{i} v.1 Microfiche. |
Contents Notes |
v.1. Technical report -- v.2. Appendices for initial correlation tests -- v.3. Appendices for RCA no. 1 -- v.4. Appendices for RCA no. 2 -- v.5 Appendix H. |