Record Display for the EPA National Library Catalog

RECORD NUMBER: 20 OF 34

Main Title Preliminary Investigation of Municipal and Industrial Water Supply and Stream Quality Control Requirements and Benefits Associated with Multiple-Purpose Studies of the Proposed Monmouth-Dallas Project, Polk County, Oregon.
CORP Author Public Health Service, Portland, Oreg. Div. of Water Supply and Pollution Control.
Year Published 1962
Report Number Working Paper-22;
Stock Number PB-217 371
Additional Subjects ( Willamette River Basin ; Reservoirs) ; ( Oregon ; Water resources) ; Rickreall Creek ; Polk County(Oregon)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB-217 371 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 25p
Abstract
The report represents a preliminary examination of present and future municipal and industrial water supply and stream quality control needs in the Rickreall Creek area of the Willamette River Basin with particular reference to the feasibility of including provisions for satisfying these needs in the Bureau of Reclamation's proposed Monmouth-Dallas Project, Polk County, Oregon. The report identifies uses and sources of water in the project area and describes sources of waste, waste treatment practices and the effects of waste effluents and land drainage materials on the quality of specific reaches of Rickreall Creek. Included also is a preliminary economic evaluation of the area, the findings of which have formed the basis for estimating future municipal and industrial water supply needs and for approximating the effects of future wastes and land uses on stream quality.