Record Display for the EPA National Library Catalog

RECORD NUMBER: 13 OF 23

Main Title Environmental impacts of advanced wastewater treatment at Ely, Minnesota /
Author Kibby, Harold, ; Hernanez., Donald J.
Other Authors
Author Title of a Work
Hernandez, Donald J.,
CORP Author Corvallis Environmental Research Lab., Oreg.
Publisher U.S. Environmental Protection Agency, Office of Research and Development, Corvallis Environmental Research Laboratory, Criteria and Assessment Branch,
Year Published 1976
Report Number EPA-600/3-76-092
Stock Number PB-259 914
OCLC Number 02536931
ISBN pbk.
Subjects Water reuse--Minnesota ; Water quality management--Minnesota--Costs ; Water--Pollution--Minnesota--Measurement ; Water--Pollution--Measurement ; Water quality management--Costs
Additional Subjects Sewage treatment ; Environmental impacts ; Air pollution ; Water pollution ; Sludge disposal ; Biochemical oxygen demand ; Calcium oxides ; Carbon dioxide ; Electricity ; Chlorine ; Fuel oil ; Assessments ; Coal ; Natural gas ; Crude oil ; Requirements ; Natural resourses ; Iron chlorides ; Tables(Data) ; Minnesota ; Energy consumption ; Ely(Minnesota) ; Sewage treatment plants ; Tertiary treatment
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9100T2FU.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD  EPA 600-3-76-092 Headquarters Library/Washington,DC 05/30/2013
ELBD ARCHIVE EPA 600-3-76-092 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD  EPA 600-3-76-092 AWBERC Library/Cincinnati,OH 04/10/1998
ELDD  EPA-600/3-76-092 CCTE/GLTED Library/Duluth,MN 11/17/2000
ESAD  EPA 600-3-76-092 Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB-259 914 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation vi, 30 pages : diagram ; 28 cm.
Abstract
The results presented in this report give an indication of the pollutants that would be generated and the resources consumed in operating a treatment facility similar to the one at Ely, Minnesota. The study analyzes not only the facility itself, but also those industries that supply products to the treatment plant. It was found that the total energy requirement of the advanced wastewater treatment plant was 50,000,000 Btu/million gallons of water treated.
Notes
Includes bibliographical references (pages 27-28).