Record Display for the EPA National Library Catalog

RECORD NUMBER: 9 OF 19

Main Title Estimating costs for water treatment as a function of size and treatment efficiency /
Author Gumerman, Robert C., ; Culp, Russell L. ; Hansen., Sigurd P.
Other Authors
Author Title of a Work
Culp, Russell L.,
Hansen, Sigurd P.,
CORP Author Culp, Wesner, Culp, Santa Ana, Calif.;Municipal Environmental Research Lab., Cincinnati, Ohio. Water Supply Research Div.
Publisher Environmental Protection Agency, Office of Research and Development, Municipal Environmental Research Laboratory ; for sale by the National Technical Information Service,
Year Published 1978
Report Number EPA-600-2-78-182; EPA-68-03-2516
Stock Number PB-285 274
OCLC Number 04175986
ISBN pbk.
Subjects Water treatment plants--United States--Costs ; Water--Purification--United States--Costs ; Water--Purification--Costs ; Water treatment plants--Costs
Additional Subjects Water treatment ; Cost analysis ; Potable water ; Performance evaluation ; Efficiency ; Operating costs ; Maintenance ; Process charting ; Design criteria ; Economics ; Regulations ; Tables(Data) ; Graphs
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=20006CTN.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EHAM  TD433.G85 1978 Region 1 Library/Boston,MA 04/29/2016
EJBD  EPA 600-2-78-182 Headquarters Library/Washington,DC 02/28/2007
ELBD ARCHIVE EPA 600-2-78-182 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD  EPA 600-2-78-182 AWBERC Library/Cincinnati,OH 01/30/2004
ERAD  EPA 600/2-78-182 Region 9 Library/San Francisco,CA 09/24/2012
ESAD  EPA 600-2-78-182 Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB-285 274 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation xi, 283 pages : illustrations ; 28 cm.
Abstract
This interim report discusses unit processes and combinations of unit processes which are capable of removing contaminants included in the National Interim Primary Drinking Water Standards. Construction and Operation and Maintenance cost curves are presented for 30 unit processes, which are considered to be especially applicable to contaminant removal. The Final Report for this project will include similar cost curves for over 100 unit processes. All costs are presented in terms of January 1978 dollars, but a discussion is included on cost updating. For construction cost, either of two methods may be used. One is to use indices which are specific in the eight categories used to determine construction cost. The second is use of an all-encompassing index, such as ENR Construction Cost Index. Operation and maintenance requirements may be readily updated or adjusted to local conditions, since labor requirements are expressed in hours per year, and electrical requirements in kilowatt-hours per year.
Notes
Contract no. CI-76-0288. "EPA/600-2-78-182." "August 1978."