Record Display for the EPA National Library Catalog

RECORD NUMBER: 32 OF 37

Main Title Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft.
CORP Author GEI Consultants, Inc., Centennial, CO.; Lockheed Martin, Edison, NJ.; Environmental Protection Agency, Washington, DC.
Year Published 2009
Stock Number PB2010-110166
Additional Subjects Dam safety ; Waste management ; Surface impoundments ; Coal ash impoundment ; Site assessments ; Recommendations ; Construction ; Operations ; Seismology ; Geology ; Instrumentation ; Structural stability ; Maintenance ; Operation methods ; Ash ponds ; Field assessments ; Wyoming ; Impoundment embankment dams ; Jim Bridger Power Station ; PacifiCorp Energy ; Spillway adequacy ; Emergency action plans ; Point of Rocks(Wyoming)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB2010-110166 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 42p
Abstract
This report presents the results of a specific site assessment of the dam safety of Flue Gas Desulphurization (FGD) Pond 1 embankment dam FGD Pond 2 embankment dam at the PacifiCorp Energy Jim Bridger Power Station in Point of Rocks, Wyoming. The specific site assessment was conducted on June 9 and 10, 2009.