Record Display for the EPA National Library Catalog

RECORD NUMBER: 29 OF 31

Main Title Start-up of municipal wastewater treatment facilities /
CORP Author Wiley and Wilson, Inc., Lynchburg, Va.;Environmental Protection Agency, Washington, D.C. Municipal Operations Branch.
Publisher U.S. G.P.O.,
Year Published 1973
Report Number EPA-430/9-74-008; EPA-68-01-0341
Stock Number PB-256 614
OCLC Number 01044093
Subjects Sewage disposal plants--United States--Handbooks, manuals, etc ; Sewage disposal plants--Handbooks, manuals, etc
Additional Subjects Sewage treatment ; Municipalities ; Manuals ; Standards ; Tests ; Education ; Safety ; Manpower ; Equipment ; Specifications ; Construction ; Sewage treatment plants
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=00000IDV.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD  EPA 430-9-74-008 Headquarters Library/Washington,DC 05/02/2013
ELBD ARCHIVE EPA 430-9-74-008 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD  EPA 430-9-74-008 AWBERC Library/Cincinnati,OH 08/27/1999
ERAD  EPA 430/9-74-008 Region 9 Library/San Francisco,CA 09/22/1990
NTIS  PB-256 614 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation viii, 92 pages ; 28 cm
Abstract
The manual is a guide for putting into initial operation a new municipal wastewater treatment plant, a new addition to an existing plant, or a change in the mode of a plant's operation. Information is given on preparing for actual treatment plant start-up, including; staffing the plant; developing standard operating procedures; establishing procedures when construction is continued during start-up; dry- and wetrun testing of equipment; on-site operator training; and safety training. Start-up procedures are described for some of the more common pre-treatment and primary treatment units. The start-up procedures for advanced wastewater treatment units and processes are beyond the scope of this manual.
Notes
"December 1973." Includes bibliographical references (pages 89-92). Sponsored by U.S. EPA Office of Water Program Operations Contract Number: 68-01-0341
Contents Notes
The manual is a guide for putting into initial operation a new municipal wastewater treatment plant, a new addition to an existing plant, or a change in the mode of a plant's operation. Information is given on preparing for actual treatment plant start-up, including; staffing the plant; developing standard operating procedures; establishing procedures when construction is continued during start-up; dry- and wetrun testing of equipment; on-site operator training; and safety training. Start-up procedures are described for some of the more common pre-treatment and primary treatment units. The start-up procedures for advanced wastewater treatment units and processes are beyond the scope of this manual.