Record Display for the EPA National Library Catalog

RECORD NUMBER: 34 OF 41

Main Title Scoping the remedial design : quick reference fact sheet.
CORP Author Environmental Protection Agency, Washington, DC. Office of Emergency and Remedial Response.
Publisher United States Environmental Protection Agency, Office of Solid Waste and Emergency Response ; Distributed by National Technical Information Service,
Year Published 1995
Report Number EPA/540-F-95-008; OSWER Dir 9355.5-21FS; OSWER-9355.5-21FS
Stock Number PB95-963305
OCLC Number 37431990
Subjects Hazardous waste site remediation
Additional Subjects Superfund ; Hazardous materials ; Waste management ; Project management ; Project planning ; Scheduling ; Site surveys ; Site characterization ; Data collection ; Remediation ; Waste disposal ; Waste treatment ; Cost estimates ; Remedial design ; Cleanup operations ; Superfund Accelerated Cleanup Model ; Statement of work ; Remedial Project Managers
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P1007WJ9.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD  OSWER Dir 9355.5-21FS Headquarters Library/Washington,DC 12/17/2014
ELBD RPS EPA 540-F-95-008 repository copy AWBERC Library/Cincinnati,OH 05/18/2015
ELBD ARCHIVE EPA-OSWER-Dir-9355.5-21FS Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD ARCHIVE OSWER Dir 9355.5-21FS Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ESAD  OSWER 9355.5-21FS Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB95-963305 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 4 pages ; 28 cm
Abstract
The fact sheet presents an overview of a manual addressed to Remedial Project Managers (RPMs) that describes the predesign planning phase of the Superfund remedial process. The Guidance will also apply to Superfund Accelerated Cleanup Model (SACM) projects such as non-time-critical removals and non-emergency early actions. The Guidance provides information on managing Fund-lead and enforcement-lead sites; it includes a description of the required information collection activities, standard Remedial Design (RD) tasks, development of remediation schedules and cost estimates for remedial design, and instructions for preparing the Statement of Work (SOW). Throughout the manual, the varying responsibilities of the RPM and other parties are distinguished according to the type of project(i.e., Fund- or enforcement-lead).
Notes
Caption title. "OSWER Dir 9355.5-21FS." "PB95-963305." "EPA/540-F-95-008." "March 1995." Presents an overview of "Guidance for Scoping the Remedial Design," a manual addressed to RPMs that describes the predesign planning phase of the Superfund remedial process.