Record Display for the EPA National Library Catalog

RECORD NUMBER: 5 OF 20

Main Title Draft environmental impact statement, Ideal Basic Industries, Cement Plant, Theodore Industrial Park, Alabama, Limestone Quarry Monroe County, Alabama.
CORP Author United States. Environmental Protection Agency. Region IV.
Publisher U.S. Environmental Protection Agency, Region IV,
Year Published 1978
Report Number EPA 904/9-78-005
Stock Number PB-285 584
OCLC Number 32105394
Subjects Cement industries--Environmental aspects--Alabama ; Quarries and quarrying--Environmental aspects--Alabama
Additional Subjects Environmental impact statements - draft ; Industrial plants ; Alabama ; Substitutes ; Sites ; Manufacturing ; Transportation ; Economics ; Ecology ; Archaeology ; Air pollution ; Noise pollution ; Solid waste disposal ; Water resources ; Water pollution ; Mobile(Alabama) ; Land use ; Air quality ; Cement plants ; Ideal Cement Company
Internet Access
Description Access URL
EPA 904-9-78-005 Summary https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101TGXB.PDF
EPA 904-9-78-005 App. v.4 https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101THNM.PDF
EPA 904-9-78-005 App. v.3 https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101THFH.PDF
EPA 904-9-78-005 App. v.2 https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101TH9J.PDF
EPA 904-9-78-005 App. v.1 https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101TH5A.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
ELBD ARCHIVE EPA 904-9-78-005 Appendix v.1-4, summary document Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
NTIS  PB-285 584 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 4 volumes : illustrations, maps ; 28 cm
Abstract
Ideal Basic Industries proposes to construct a new cement plant in Theodore Industrial Park near Mobile, Alabama and a supporting limestone quarry in Monroe County near Monroeville, Alabama. This impact statement addresses the existing air quality in Mobile County and Theodore Industrial Park and the natural environment of the proposed quarry sites. Air emissions at the proposed plant site are modeled and their impacts are projected for the area. The impact of constructing an access road across wetlands are discussed. Mitigative measures to reduce these impacts are presented as well as alternative locations. (Portions of this document are not fully legible)