Record Display for the EPA National Library Catalog

RECORD NUMBER: 38 OF 734

Main Title Analysis of priority pollutants at a primary aluminum production facility /
Author Rawlings, G. D.,
Other Authors
Author Title of a Work
Hoogheem, T. J.
CORP Author Monsanto Research Corp., Dayton, OH.;Industrial Environmental Research Lab.-Cincinnati, OH.
Publisher Environmental Protection Agency, Office of Research and Development, Industrial Environmental Research Laboratory ; for sale by the National Technical Information Service,
Year Published 1979
Report Number EPA-600/2-79-087; MRC-DA-861; EPA-68-03-2550
Stock Number PB297491 ; 22161
OCLC Number 05199053
ISBN pbk.
Subjects Aluminum industry and trade--Waste disposal ; Water--Pollution--Measurement
Additional Subjects Water pollution control ; Air pollution control equipment ; Aluminum industry ; Coagulation ; Clarification ; Lagoons(Ponds) ; Settling ; Organic compounds ; Sources ; Process charting ; Performance evaluation ; Sampling ; Water analysis ; Industrial waste treatment ; Scrubbing
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=91017UGX.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EHAM  TD899.A4R39 Region 1 Library/Boston,MA 04/29/2016
EJBD  EPA 600/2-79-087 c.1 Headquarters Library/Washington,DC 01/16/2014
EKBD  EPA-600/2-79-087 Research Triangle Park Library/RTP, NC 09/07/2001
ELBD ARCHIVE EPA 600/2-79-087 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ESAD  EPA 600-2-79-087 Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB-297 491 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation vii, 38 pages : illustrations ; 28 cm.
Abstract
This project investigated the source of priority pollutants, assessment of the wastewater treatment plant, and priority pollutant removal efficiency for a single Soderberg-type primary aluminum plant. Forty-eight hour composite samples were collected from the following streams: (1) plant intake water; (2) wastewater from the primary air pollution control system (gas stream cooling water and wet EPS's); (3) secondary air pollution control system (room ventilation wet scrubber liquor); (4) paste plant briquette cooling water; and (5) final effluent after the wastewater treatment plant. Wastewater from the primary air pollution control system entered a conventional chemical coagulation (using slacked lime)-clarification plant. Clarified water from the clarifier was combined with the other three wastewater streams and flowed into a settling lagoon with a 20-hr hydraulic retention time. Clarified lagoon water was finally discharged to the river. The principal source of organic compounds in the wastewater was from the primary and secondary air pollution control systems and results from the volatilization of petroleum coke and pitch in the Soderberg anode. Wastewater treatment plant removal efficiencies of greater than 85% were achieved for the majority of the organic priority pollutant species detected.
Notes
Contract no. 68-03-2550. Apr. 1979. Includes bibliographical references.