Main Title Estimating water treatment costs. Volume I, Summary /
Author Gumerman, Robert C. ; Culp, Russell L. ; Hansen., Sigurd P.
Other Authors
Author Title of a Work
Culp, Russell L.,
Hansen, Sigurd P.
CORP Author Culp/Wesner/Culp, Santa Ana, CA.;Municipal Environmental Research Lab., Cincinnati, OH.
Publisher U.S. Environmental Protection Agency,
Year Published 1979
Report Number EPA 600/2-79-162a; EPA-68-03-2516
Stock Number PB80-139819
OCLC Number 24346127
Additional Subjects Cost analysis ; Water treatment ; Construction costs ; Potable water ; Operating costs ; Activated carbon treatment ; Chlorination ; Flocculating ; Ion exchanging ; Ozonization ; Osmosis ; Filtration ; Design criteria ; Cost estimates ; Maintenance ; Efficiency ; Tables(Data) ; Reverse osmosis
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=30000909.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EHAM  TD420.E5 no.600/2-79-162a Region 1 Library/Boston,MA 04/29/2016
EJBD  EPA 600/2-79-162a Headquarters Library/Washington,DC 12/27/2013
ELBD ARCHIVE EPA 600/2-79-162a Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD  EPA 600-2-79-162a AWBERC Library/Cincinnati,OH 02/11/2000
ERAD  EPA 600/2-79-162a Region 9 Library/San Francisco,CA 10/01/2012
ESAD  EPA 600-2-79-162A Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB80-139819 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 99 pages
Abstract
This report discusses unit processes and combinations of unit processes that are capable of removing contaminants included in the National Interim Primary Drinking Water Regulations. Construction and operation and maintenance cost curves are presented for 99 unit processes that are considered to be especially applicable to contaminant removal. The report is divided into four volumes. Volume 1 is a summary volume. For each unit process included in this report, conceptual designs were formulated, and construction costs were then developed using the conceptual designs. The construction cost curves were checked for accuracy. Costs are in October 1978 dollars.
Notes
"EPA-600/2-79-162a" "August 1979."