Record Display for the EPA National Library Catalog

RECORD NUMBER: 2 OF 5

Main Title Draft environmental impact statement on proposed issuance of a new source National Pollutant Discharge Elimination System, permit number IA-0060909, to Iowa Southern Utilities Company, Ottumwa Generating Station, for discharge of wastewaters to the Des Moines River near Ottumwa, Iowa [microform] /
CORP Author United States. Environmental Protection Agency. Region VII.
Publisher The Region,
Year Published 1977
Report Number EPA-907/9-77-004; EPA-7-IA-OTTUMWA-WAPELLO-NSDP-77
Stock Number PB-280 369
OCLC Number 858036745
Subjects Electric power-plants--Environmental aspects--Iowa--Wapello County
Additional Subjects Environmental impact statements-draft ; Steam electric power generation ; Iowa ; Electric power plants ; Waste disposal ; Water pollution ; Air pollution ; Industrial wastes ; Coal ; Water quality ; Des Moines River ; Iowa ; Wapello County(Iowa) ; Chillicothe(Iowa) ; Ottumwa(Iowa) ; Water pollution control ; Air pollution control ; Air quality ; Coal fired power plants ; Iowa Southern Utilities Company
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101SM2C.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
ELBD ARCHIVE EPA-907-9-77-004 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
NTIS  PB-280 369 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 1 v. (various pagings) : ill., maps ; 28 cm.
Abstract
The U.S. Environmental Protection Agency (EPA) is considering the issuance of a new source National Pollutant Discharge Elimination System (NPDES) permit (P.L. 92-500, Section 402) for discharge of wastewaters from Iowa Southern Utilities' proposed Ottumwa Generating Station (OGS). Pursuant to the National Environmental Policy Act of 1969 (P.L. 91-190), EPA has prepared this environmental impact statement (EIS) to evaluate the potential impacts of this action on the Des Moines River, the cities of Chillicothe and Ottumwa, and the surrounding areas. This EIS is a multiagency document prepared in conjunction with the U.S. Army Corps of Engineers. It will serve as the Corps of Engineers' EIS in the issuance of a Section 404, Federal Water Pollution Control Act Amendments permit and a Section 10, River and Harbors Act permit. The proposed site for the 727 megawatt coal-fired steam-electric generating station is located adjacent to the Des Moines River approximately 8 miles northwest of Ottumwa, Iowa. Its estimated cost is $300 million. OGS will utilize a closed-cycle cooling system and will require make-up water at a rate of 17 cfs at maximum load conditions. Total discharge to the Des Moines River is estimated to be 1.4 cfs at maximum load conditions. Low sulfur western coal will fuel the plant at a rate of 2,200,000 tons per year. Principal constituents of the plant stack emissions are particulate matter, sulfur oxides, nitrogen oxides and various trace elements. An electrostatic precipator will be used to control particulate matter. Selection of low sulfur coal will minimize SO2 emissions, and furnace design will control NO2. (Color illustrations reproduced in black and white)
Notes
"EPA 907/9-77-004." "DEIS 004." "EPA-7-IA-Ottumwa-Wapello-NSDP-77." Includes bibliographical references. "July 1977."