Abstract |
The analysis provides a preliminary estimate of the economic potentials and anticipated growth of the area. The study period is the 50-year period 1960-2010, with an interim point at 1985. Two limitations apply to this study. The first is that it is intended only as a preliminary estimate of the outlook for the area's growth. The second limitation is that the study is intended for use particularly in assessing future water needs. Emphasis has been placed on the analysis of those industries which make heavy demands upon the water resource. Other industries have been considered only insofar as they may have a significant effect on future population. For this reason, the study is not submitted as a detailed industrial forecast. |