Main Title Executive summary for full-scale dual-alkali demonstration system at Louisville Gas and Electric Co. : final design and system cost /
Author Van Ness, R. P. ; Somers, R. C. ; Weeks, R. C. ; Frank, T. ; Ramans., G. J. ;
Other Authors
Author Title of a Work
VanNess, R. D.
Kaplan, Norman.
CORP Author Louisville Gas and Electric Co., KY.;Industrial Environmental Research Lab., Research Triangle Park, NC.
Publisher The Office ; Available to the public through the National Technical Information Service,
Year Published 1979
Report Number EPA-600/7-79-221a; EPA-68-02-2189
Stock Number PB80-146707
OCLC Number 07062862
Subjects Flue gases--Desulfurization ; Pollution control equipment--Kentucky--Louisville ; Coal-fired power plants--Kentucky--Louisville ; Flue gases--Desulphurization
Additional Subjects Air pollution control equipment ; Scrubbers ; Air pollution control ; Sulfur dioxide ; Gas scrubbing ; Cost estimates ; Design ; Dual alkali scrubbing ; Flue gas desulfurization ; Coal fired power plants
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101FUY0.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EKBD  EPA-600/7-79-221a Research Triangle Park Library/RTP, NC 01/02/2004
ELBD ARCHIVE EPA 600-7-79-221a Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ESAD  EPA 600-7-79-221A Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB80-146707 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation vii, 29 p. : ill., charts ; 28 cm.
Abstract
The report describes phase 2 of a 4-phase demonstration program involving the dual alkali process for controlling SO2 emissions from Unit 6, a coal-fired boiler at Louisville Gas and Electric Co.'s Cane Run Station. The program consists of four phases: (1) preliminary design and cost estimation; (2) engineering design, construction, and mechanical testing; (3) startup and performance testing; and (4) 1-year operation and test programs. The report describes final engineering design, construction and mechanical testing, and installed system capital cost. Construction of the system was completed in February 1979 and system startup was initiated in March 1979. Total capital investment for the entire plant, including waste disposal, is estimated to be $20.4 million (construction of the waste disposal facilities is not complete).
Notes
"EPA-600/7-79-221a"--Cover. "September 1979"--Cover. "Arthur D. Little, Inc."--P. vii. "Louisville Gas and Electric Company"--T.p. "Industrial Environmental Research Laboratory, Office of Environmental Engineering and Technology, Research Triangle Park, N.C."--T.p. "Contract No. 68-02-2189, Program Element No. EHE624A"--T.p. "EPA Project Officer: Norman Kaplan"--T.p.