Main Title Coal Ash Impoundment - Specific Site Assessment, PacifiCorp Energy: Jim Bridger Power Station.
Author S. G. Brown ; A. L. Misgen ; D. L. Johnson
CORP Author GEI Consultants, Inc., Edison, NJ.; Lockheed-Martin, Corp., Edison, NJ.; Environmental Protection Agency, Washington, DC.
Year Published 2009
Report Number Proj. 091330
Stock Number PB2010-100476
Additional Subjects Site assessment ; Dam safety ; Flue Gas Desulphurization ; Impoundments ; Coal ash ; Jim Bridger Power Station ; Wyoming ; FEMA guidelines ; Flue Gas Desulphurization (FGD) ; Environmental Protection Agency (EPA) ; Federal Emergency Management Agency (FEMA)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB2010-100476 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 121p
Abstract
This report presents the results of a specific site assessment of the dam safety of Flue Gas Desulphurization (FGD) Pond 1 embankment dam FGD Pond 2 embankment dam at the PacifiCorp Energy Jim Bridger Power Station in Point of Rocks, Wyoming. The specific site assessment was conducted on June 9 and 10, 2009. These impoundments were assessed because their failure may result in significant economic loss, environmental damage, disruption of lifeline facilities or loss of life (significant or high hazard according to U.S. Environmental Protection Agency (EPA) classification). The specific site assessment was performed with reference to Federal Emergency Management Agency (FEMA) guidelines for dam safety, which includes other federal agency guidelines and regulations (such as U.S. Army Corps of Engineers and U.S. Bureau of Reclamation) for specific issues, and defaults to state requirements where not specifically addressed by federal guidance or if the state requirements were more stringent.