Record Display for the EPA National Library Catalog

RECORD NUMBER: 11 OF 127

Main Title Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): Northern States Power Company Minnesota, Sherburne County Power Station, Becker, Minnesota. (Final Report).
CORP Author CHA, Albany, NY.; Lockheed Martin Services, Inc., Edison, NJ.; Environmental Protection Agency, Washington, DC.
Year Published 2009
Report Number Proj. CHA NO-20085-2010-1510
Stock Number PB2010-106936
Additional Subjects Dam safety ; Site assessments ; Figures ; Tables (Data) ; Field assessments ; Data evaluation ; Recommendations ; Sherburne county Power Station ; Northern States Power Company ; Coal combustion surface impoundments ; Becker (Minnesota)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB2010-106936 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 149p
Abstract
CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project no. 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Northern States Power Company-Minnesota's (d/b/a of Xcel Energy) Sherburne County Power Station, located in Becker, Minnesota. CHA made a site visit on September 16, 2009 to inventory coal combustion surface impoundments at the facility, to perform visual observations of the impoundment dikes, and to collect relevant information regarding the Bottom Ash Pond, Pond No. 1, Pond No. 2 and Pond No. 3 impoundments.