Record Display for the EPA National Library Catalog

RECORD NUMBER: 2 OF 28

Main Title Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Annabessacook Lake, Kennebec and Androscoggin Counties, Maine. Annabessacook Lake PCAP-TMDL Report, Maine DEPLW 2003-0627.
CORP Author Maine Dept. of Environmental Protection, Augusta.; Environmental Protection Agency, Washington, DC.
Year Published 2004
Stock Number PB2013-100051
Additional Subjects Phosphorus ; Sediment loads ; Load capacity ; Maine ; Water quality standards ; Water pollution ; Pollutants ; Environmental protection ; Watersheds ; Lakes ; Fisheries ; Developed lands ; Non-developed lands ; Total Maximum Daily Load(TMDL) ; Annabessacook Lake(Maine) ; Kennebec County(Maine) ; Androscoggin County(Maine)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB2013-100051 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 42p
Abstract
The objectives of this project were twofold: First, a comprehensive land use inventory was undertaken to assist Maine DEP in developing a Phosphorus Control Action Plan (PCAP) and a Total Maximum Daily Load (TMDL) report for the Annabessacook Lake watershed. Simply stated, a TMDL is the total amount of phosphorus that a lake can receive without harming water quality. Maine DEP, with the assistance of CWD and MACD, will address and incorporate public comments before final submission to the U.S. EPA. Secondly, watershed survey work, including a shoreline survey evaluation, was conducted by CWD to assess total phosphorus reduction techniques that would benefit the Annabessacook Lake watershed. Watershed survey work included assessing direct drainage nonpoint source (NPS) pollution sites. The results of this assessment include recommendations for future conservation work in the watershed to help citizens, organizations, and agencies restore and protect Annabessacook Lake water quality.