Record Display for the EPA National Library Catalog

RECORD NUMBER: 38 OF 113

Main Title Assessment of Dam Safety Coal Combustion Surface Impoundments Draft Report, Georgia Power Company, Plant Bowen, Cartersville, Georgia.
CORP Author CHA, Albany, NY.; Lockheed Martin, Edison, NJ.; Environmental Protection Agency, Washington, DC.
Year Published 2009
Stock Number PB2010-110161
Additional Subjects CHA ; Site assessments ; Coal combustion surface impoundments ; Dam safety inspections ; Georgia ; Site visits ; Inventory ; Visual observations ; Containment dikes ; Georgia Power Company Plant Bowen ; Cartersville(Georgia)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB2010-110161 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 93p
Abstract
CHA was contracted by Lockheed Martin to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Georgia Power Company Plant Bowen, which is located in Cartersville, Georgia as shown on Figure 1 Project Location Map. CHA made a site visit on May 26 and 27, 2009 to perform visual observations and to inventory coal combustion surface impoundments at the facility, inspect the containment dikes, and to collect relevant information regarding the site assessment.