Record Display for the EPA National Library Catalog

RECORD NUMBER: 24 OF 178

Main Title Cost estimates methodology for once-through cooling water discharge modifications /
Author Hayden, John W.,
Other Authors
Author Title of a Work
Mayer, Richard,
CORP Author Acres American, Inc., Buffalo, N.Y.;Industrial Environmental Research Lab., Research Triangle Park, N.C.
Publisher Environmental Protection Agency, Office of Energy, Minerals, and Industry, Industrial Environmental Research Laboratory ; For sale by the National Technical Information Service,
Year Published 1976
Report Number EPA 600-2-76-078; EPA-68-03-2053; EPA-ROAP-21AZU-021
Stock Number 22161
OCLC Number 03996754
ISBN pbk.
Subjects Electric power-plants ; Electric light plants
Additional Subjects Cooling water ; Water pollution control ; Industrial water ; Thermal power plants ; Cost engineering ; Electric power plants ; Construction ; Earth handling equipment ; Engineering ; Cost analysis ; Cost estimates ; Design ; Materials ; Labor estimates ; Installing ; Once through cooling
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=91015OXC.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EKBD  EPA-600/2-76-078 Research Triangle Park Library/RTP, NC 06/27/2003
ELBD ARCHIVE EPA 600-2-76-078 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ERAD  EPA 600/2-76-078 Region 9 Library/San Francisco,CA 09/11/2012
ESAD  EPA 600-2-76-078 Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB-251 663 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation xvi, 302 pages : illustrations ; 28 cm.
Abstract
The report gives a methodology for evaluating the engineering and cost implications of constructing or modifying once-through cooling water discharge systems of thermal-electric generating plants within the contiguous U.S. The procedures give (to persons not skilled in cost engineering) a means of preparing preliminary cost estimates from conceptual or design drawings. The user should, however, have a technical background and be familiar with once-through cooling water discharge systems. Principal construction elements of discharge system construction and modification are identified and grouped into categories. Materials and installation methods are discussed for each construction element. Data is given on labor, materials, equipment, and productivity assumed in unit cost development. A step-by-step procedure is given for: (1) estimating construction costs, and (2) resolving construction costs into project and annual costs. An example is shown using the methodology; the result is compared with actual construction costs for modifications to an existing discharge system.
Notes
Contract 68-03-2052, ROAP 21AZU-021, Program element 1BB-392. "EPA 600-2-76-078." "March 1976." Cover title. Includes bibliographical references.