Record Display for the EPA National Library Catalog

RECORD NUMBER: 42 OF 118

Main Title Estimating water treatment costs. Volume 3, Cost curves applicable to 2,500 gpd to 1 mgd treatment plants /
Author Hansen, Sigurd P. ; Gumerman, Robert C. ; Culp., Russell L.
Other Authors
Author Title of a Work
Gumerman, Robert C.
Culp, Russell L.,
CORP Author Culp/Wesner/Culp, Santa Ana, CA.;Municipal Environmental Research Lab., Cincinnati, OH.
Publisher U.S. Environmental Protection Agency,
Year Published 1979
Report Number EPA 600/2-79-162c; EPA-68-03-2516
Stock Number PB80-148455
OCLC Number 24352726
Additional Subjects Cost analysis ; Water treatment ; Construction costs ; Potable water ; Operating costs ; Maintenance ; Activated carbon treatment ; Chlorination ; Ozonation ; Filtration ; Ion exchanging ; Osmosis ; Pumping ; Sludge disposal ; Graphs(Charts) ; Tables(Data) ; Reverse osmosis
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=300009IH.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EHAM  TD420.E5 no.600/2-79-162c Region 1 Library/Boston,MA 04/29/2016
EJBD  EPA 600-2-79-162c Headquarters Library/Washington,DC 03/22/2016
ELBD ARCHIVE EPA 600-2-79-162c Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD  EPA 600-2-79-162c AWBERC Library/Cincinnati,OH 02/11/2000
ERAD  EPA 600/2-79-162c Region 9 Library/San Francisco,CA 10/01/2012
NTIS  PB80-148455 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 178 pages
Abstract
This report discusses unit processes and combinations of unit processes that are capable of removing contaminants included in the National Interim Primary Drinking Water Regulations. Construction and operation and maintenance cost curves are presented for 99 unit processes that are considered to be especially applicable to contaminant removal. The report is divided into four volumes. Volume 3 includes cost curves applicable to flows of 2,500 gpd to 1 mgd. For each unit process included in this report, conceptual designs were formulated, and construction costs were then developed using the conceptual designs.