Main Title Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report. American Electric Power, Cardinal Power Plant, Brilliant, Ohio.
CORP Author CHA, Albany, NY.; Lockheed Martin, Edison, NJ.; Environmental Protection Agency, Washington, DC.
Year Published 2009
Stock Number PB2010-109952
Additional Subjects CHA ; Site assessments ; Coal combustion surface impoundments ; Dam safety inspections ; Ohio ; Site visits ; Inventory ; Visual observations ; Containment dikes ; Cardinal Power Plant ; American Electric Power ; Brilliant(Ohio)
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB2010-109952 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 149p
Abstract
CHA was contracted by Lockheed Martin (a contractor to the United State Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of American Electric Powers (AEP) Cardinal Power Plant, which is located in Brilliant, Ohio as shown on Figure 1 Project Location Map CHA made a site visit on September 1, 2009 and September 2, 2009 to inventory coal combustion surface impoundments at the facility, perform visual observations of the containment dikes, and collect relevant information regarding the site assessment.