Main Title |
Compendium of costs of remedial technologies at hazardous waste sites / |
Author |
Yang, E. C. ;
Bauma, D. ;
Schwartz, L. ;
Werner, J. D.
|
Other Authors |
|
CORP Author |
Environmental Law Inst., Washington, DC.;Environmental Protection Agency, Cincinnati, OH. Hazardous Waste Engineering Research Lab. |
Publisher |
Hazardous Waste Engineering Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, |
Year Published |
1987 |
Report Number |
EPA/600/2-87/087; EPA-68-03-3113 |
Stock Number |
PB88-113477 |
OCLC Number |
17436386 |
Subjects |
Hazardous waste treatment facilities--Costs
|
Additional Subjects |
Hazardous materials ;
Industrial wastes ;
Costs ;
Site survey ;
Waste disposal ;
Public health ;
Water pollution ;
Solid waste disposal ;
Graphs(Charts) ;
Remedial actions ;
Superfund program ;
Municipal wastes ;
Land reclamation ;
Liquid waste disposal
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJBD ARCHIVE |
EPA 600-2-87-087 |
|
Headquarters Library/Washington,DC |
05/14/2019 |
ERAD |
EPA 600/2-87-087 |
|
Region 9 Library/San Francisco,CA |
10/04/2012 |
DISPERSAL |
NTIS |
PB88-113477 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
205 pages ; 28 cm |
Abstract |
Accurate estimates of hazardous waste site remedial responses are important in order to: (1) budget the Superfund Response Fund; (2) estimate costs at specific sites; (3) cost-effectively select remedial actions; and, (4) effectively negotiate with private response parties for private action or cost recovery. The costs documented here are the bottomline numbers showing the ultimate cost of the responses. The data supporting this compendium is derived from a series of 31 case studies of actual hazardous waste remedial responses. The report also investigates the divergence between actual remedial costs and estimates from existing engineering cost methodologies. |
Notes |
"October 1987." Contract 68-03-3113. Final report, 1/85 - 9/86. |