Main Title |
Executive summary for full-scale dual-alkali demonstration at Louisville Gas and Electric Co. : preliminary design and cost estimate / |
Author |
VanNess, R. P. ;
Somers, R. C. ;
Frank, T. ;
Lysaght, J. M. ;
Jashnani., I. L. ;
|
Other Authors |
|
CORP Author |
Louisville Gas and Electric Co., Ky. ;Little (Arthur D.), Cambridge, Mass. ;Combustion Equipment Associates, Inc., New York.;Industrial Environmental Research Lab., Research Triangle Park, N.C. |
Publisher |
Environmental Protection Agency, Office of Research and Development, Industrial Environmental Research Laboratory ; For sale by the National Technical Information Service, |
Year Published |
1978 |
Report Number |
EPA 600-7-78-010a; EPA-68-02-2189 |
Stock Number |
22161 |
OCLC Number |
04268306 |
ISBN |
pbk. |
Subjects |
Air--Pollution ;
Scrubber (Chemical technology) ;
Alkalies
|
Additional Subjects |
Air pollution control ;
Scrubbers ;
Sulfur dioxide ;
Electric power plants ;
Design criteria ;
Performance evaluation ;
Cost analysis ;
Operating costs ;
Capitalized costs ;
Boilers ;
Combustion products ;
Industrial wastes ;
Dual alkali scrubbing
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJBD |
EPA 600-7-78-010a |
|
Headquarters Library/Washington,DC |
07/22/2013 |
EKBD |
EPA-600/7-78-010a |
|
Research Triangle Park Library/RTP, NC |
11/21/2003 |
ELBD ARCHIVE |
EPA 600-7-78-010a |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ESAD |
EPA 600-7-78-010A |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB-281 530 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
ix, 24 p. : ill. ; 28 cm. |
Abstract |
The report is the executive summary for the preliminary design of the dual-alkali system, designed by Combustion Equipment Associates, Inc./Arthur D. Little, Inc. and being installed to control SO2 emissions from Louisville Gas and Electric Company's Cane Run Unit No. 6 boiler. The project consists of four phases: I--preliminary design and cost estimates; II--engineering design, construction, and mechanical testing; III--startup and performance testing; and IV--1 year operation and testing. Developed as part of Phase I, the executive summary presents salient facts and conclusions from the Phase I report for use by upper management and the general public. |
Notes |
Prepared for U.S. Environmental Protection Agency, Office of Research and Development, under contract no. 68-02-2189, program element no. EHE624A. "EPA Project Officer: Norman Kaplan." Issued Jan. 1978. |