Main Title |
A cost index format for BATEA achievement by the iron and steel industry / |
Author |
Huff, Linda L. ;
Huff, L. L. ;
Stockham, J. D.
|
Other Authors |
|
CORP Author |
IIT Research Inst., Chicago, IL.;Industrial Environmental Research Lab., Research Triangle Park, NC. |
Publisher |
U.S. Environmental Protection Agency, Industrial Environmental Research Laboratory ; National Technical Information Service [distributor], |
Year Published |
1979 |
Report Number |
EPA-600/2-79-025; EPA-68-02-2617 |
Stock Number |
PB-299 184 |
OCLC Number |
08291564 |
Subjects |
Iron industry and trade--United States--Costs ;
Iron industry and trade--Costs
|
Additional Subjects |
Cost indexes ;
Technology assessment ;
Iron and steel industry ;
Cost analysis ;
Capitalized costs ;
Operating costs ;
Industrial plants ;
Cost engineering ;
Depreciation ;
Pollution ;
Fixed investment ;
Capital ;
Technology innovation ;
Pollution control
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EHAM |
EPA-600/2-79-025 |
|
Region 1 Library/Boston,MA |
05/25/2016 |
EKBD |
EPA-600/2-79-025 |
|
Research Triangle Park Library/RTP, NC |
08/11/2000 |
ELBD ARCHIVE |
EPA 600-2-79-025 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ESAD |
EPA 600-2-79-025 |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB-299 184 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
iv, 39 pages : illustrations ; 28 cm. |
Abstract |
The report describes a study to develop a format for Best Available Technology Economically Achievable (BATEA) cost analysis, including pertinent cost data. The format is to aid Regional U.S. EPA personnel in evaluating economic appeal cases for BATEA. Through discussion with U.S. EPA Regional personnel and a review of cost engineering literature, two sample formats were developed: one for capital investment; the other for operating costs. The cost analysis formats were designed specifically for application to the iron and steel industry; although, with modification, they could be used for other industries as well. General information regarding various cost components is provided as a basis for analyzing cost estimates presented by specific iron and steel plants. |
Notes |
"IIT Research Institute." "January 1979." Includes bibliographical references. "Contract no. 68-02-2617, task no. 2-4, program element no. 1BB610." |