Main Title |
Estimating water treatment costs. Volume I, Summary / |
Author |
Gumerman, Robert C. ;
Culp, Russell L. ;
Hansen., Sigurd P.
|
Other Authors |
|
CORP Author |
Culp/Wesner/Culp, Santa Ana, CA.;Municipal Environmental Research Lab., Cincinnati, OH. |
Publisher |
U.S. Environmental Protection Agency, |
Year Published |
1979 |
Report Number |
EPA 600/2-79-162a; EPA-68-03-2516 |
Stock Number |
PB80-139819 |
OCLC Number |
24346127 |
Additional Subjects |
Cost analysis ;
Water treatment ;
Construction costs ;
Potable water ;
Operating costs ;
Activated carbon treatment ;
Chlorination ;
Flocculating ;
Ion exchanging ;
Ozonization ;
Osmosis ;
Filtration ;
Design criteria ;
Cost estimates ;
Maintenance ;
Efficiency ;
Tables(Data) ;
Reverse osmosis
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EHAM |
TD420.E5 no.600/2-79-162a |
|
Region 1 Library/Boston,MA |
04/29/2016 |
EJBD ARCHIVE |
EPA 600/2-79-162a |
|
Headquarters Library/Washington,DC |
12/27/2013 |
EJBD |
EPA 600/2-79-162a |
|
Headquarters Library/Washington,DC |
12/27/2013 |
ELBD |
EPA 600-2-79-162a |
|
AWBERC Library/Cincinnati,OH |
02/11/2000 |
ERAD |
EPA 600/2-79-162a |
|
Region 9 Library/San Francisco,CA |
10/01/2012 |
ESAD |
EPA 600-2-79-162A |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB80-139819 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
99 pages |
Abstract |
This report discusses unit processes and combinations of unit processes that are capable of removing contaminants included in the National Interim Primary Drinking Water Regulations. Construction and operation and maintenance cost curves are presented for 99 unit processes that are considered to be especially applicable to contaminant removal. The report is divided into four volumes. Volume 1 is a summary volume. For each unit process included in this report, conceptual designs were formulated, and construction costs were then developed using the conceptual designs. The construction cost curves were checked for accuracy. Costs are in October 1978 dollars. |
Notes |
"EPA-600/2-79-162a" "August 1979." |