Record Display for the EPA National Library Catalog

RECORD NUMBER: 48 OF 49

Main Title Watershed Manipulation Project: Field Implementation Plan for 1986-1989.
Author Erickson, H. E. ; Rustad, L. E. ; Narahara, A. M. ; Nodvin, S. C. ;
CORP Author NSI Technology Services Corp., Corvallis, OR. ;Maine Univ. at Orono. Sawyer Environmental Chemistry Lab.;Corvallis Environmental Research Lab., OR.
Publisher Feb 91
Year Published 1991
Report Number EPA/600/3-91/007;
Stock Number PB91-148403
Additional Subjects Watersheds ; Water quality ; Biogeochemistry ; Acidification ; Water pollution ; Bear Brook ; Maine ; Lead Mountain ; Field tests ; Site characterization ; Implementation ; pH ; Water chemistry ; Mathematical models ; Forests ; Soil surveys ; Deposition ; Sampling ; Hydrology ; Air water interactions ; Watershed Manipulation Project ; Field implementation plan ; Direct/Delayed Response Project
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB91-148403 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 93p
Abstract
The Field Implementation Plan (FIP) of the Watershed Manipulation Project (WMP) has been developed for the Bear Brook Watershed in Maine (BBWM). The document provides details on field activities for site and task groups for the period 1986 to October 1989. Specific objectives of the FIP are to: describe the Bear Brook manipulation site; detail field experimental and sampling designs for hypothesis testing at the BBWM; and, summarize field methods used at the Bear Brook site.