Main Title |
Watershed Manipulation Project: Field Implementation Plan for 1986-1989. |
Author |
Erickson, H. E. ;
Rustad, L. E. ;
Narahara, A. M. ;
Nodvin, S. C. ;
|
CORP Author |
NSI Technology Services Corp., Corvallis, OR. ;Maine Univ. at Orono. Sawyer Environmental Chemistry Lab.;Corvallis Environmental Research Lab., OR. |
Publisher |
Feb 91 |
Year Published |
1991 |
Report Number |
EPA/600/3-91/007; |
Stock Number |
PB91-148403 |
Additional Subjects |
Watersheds ;
Water quality ;
Biogeochemistry ;
Acidification ;
Water pollution ;
Bear Brook ;
Maine ;
Lead Mountain ;
Field tests ;
Site characterization ;
Implementation ;
pH ;
Water chemistry ;
Mathematical models ;
Forests ;
Soil surveys ;
Deposition ;
Sampling ;
Hydrology ;
Air water interactions ;
Watershed Manipulation Project ;
Field implementation plan ;
Direct/Delayed Response Project
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB91-148403 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
93p |
Abstract |
The Field Implementation Plan (FIP) of the Watershed Manipulation Project (WMP) has been developed for the Bear Brook Watershed in Maine (BBWM). The document provides details on field activities for site and task groups for the period 1986 to October 1989. Specific objectives of the FIP are to: describe the Bear Brook manipulation site; detail field experimental and sampling designs for hypothesis testing at the BBWM; and, summarize field methods used at the Bear Brook site. |