Main Title |
Quality assurance guidelines for IERL-Ci project officers / |
Author |
Stratton, C. L., ;
Bonds, John D.
|
Other Authors |
|
CORP Author |
Environmental Science and Engineering, Inc., Gainesville, FL.;Industrial Environmental Research Lab.-Cincinnati, OH. |
Publisher |
U.S. Environmental Protection Agency, Office of Research and Development, Industrial Environmental Research Laboratory, |
Year Published |
1980 |
Report Number |
EPA-600/9-79-046; EPA-68-03-2656 |
Stock Number |
PB80-181837 |
OCLC Number |
07029232 |
Subjects |
Quality assurance
|
Additional Subjects |
Control administration ;
Quality assurance ;
Research projects ;
Auditing ;
Grants ;
Project management ;
Sampling ;
Environmental impacts ;
Quality control ;
Procurement ;
Project control ;
Data processing ;
Research management
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJBD ARCHIVE |
EPA 600/9-79-046 |
|
Headquarters Library/Washington,DC |
12/31/2013 |
EJBD |
EPA 600/9-79-046 |
|
Headquarters Library/Washington,DC |
02/12/2014 |
EKBD |
EPA-600/9-79-046 |
|
Research Triangle Park Library/RTP, NC |
05/28/2004 |
NTIS |
PB80-181837 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
ix, 186 pages : illustrations, figures, tables ; 28 cm |
Abstract |
The document provides guidelines to Industrial Environmental Research Laboratory-Cincinnati (IERL-Ci) Project Officers for (1) incorporating quality assurance (QA) criteria in contract procurement and grant awards; (2) monitoring quality assurance of extramural projects; and (3) conducting QA audits for projects involving sampling and analysis activities. The Project Officer's responsibilities are described for the initiation, monitoring, and satisfactory conclusion of contracts, research and demonstration grants, and cooperative agreements of the type normally funded by IERL-Ci. Guidance is provided to assure QA is adequately addressed during project conception and solicitation and that prospective grantees are informed of QA requirements. A technical evaluation system is presented for the evaluation of the QA aspects of proposals and grant applications. The basic elements of an acceptable QA program and of a project QA plan are described, and the Project Officer's role in QA monitoring is discussed. A procedure is described for conducting QA audits of active projects. Checklists are included to assist the Project Officer. |
Notes |
"December 1979." "Final Report 9/78-12/79." Includes bibliographical references (pages 68-70). U.S. Environmental Protection Agency Contract No. Contract Number: 68-03-2656. |
Contents Notes |
The document provides guidelines to Industrial Environmental Research Laboratory-Cincinnati (IERL-Ci) Project Officers for (1) incorporating quality assurance (QA) criteria in contract procurement and grant awards; (2) monitoring quality assurance of extramural projects; and (3) conducting QA audits for projects involving sampling and analysis activities. The Project Officer's responsibilities are described for the initiation, monitoring, and satisfactory conclusion of contracts, research and demonstration grants, and cooperative agreements of the type normally funded by IERL-Ci. Guidance is provided to assure QA is adequately addressed during project conception and solicitation and that prospective grantees are informed of QA requirements. A technical evaluation system is presented for the evaluation of the QA aspects of proposals and grant applications. The basic elements of an acceptable QA program and of a project QA plan are described, and the Project Officer's role in QA monitoring is discussed. A procedure is described for conducting QA audits of active projects. Checklists are included to assist the Project Officer. |