Main Title |
Measuring airborne asbestos following an abatement action / |
Author |
Keyes, Dale L. ;
Breen, J. J. ;
Beard, M. E.
|
Other Authors |
|
CORP Author |
United States. Environmental Protection Agency. Office of Pesticides and Toxic Substances.; Environmental Monitoring Systems Laboratory (Research Triangle Park, N.C.). Quality Assurance Division.; Research Triangle Inst., Research Triangle Park, NC.; Environmental Sciences, Tucson, AZ. |
Publisher |
U.S. Environmental Protection Agency, |
Year Published |
1985 |
Report Number |
EPA 600/4-85-049; EPA EPA 600/4-85-049; EPA-68-02-3767; PB86129806 |
Stock Number |
PB86-129806 |
OCLC Number |
14186429 |
Subjects |
Asbestos dust ;
Air--Pollution--Measurement ;
Buildings ;
Air pollution control ;
Industrial hygiene ;
Public health ;
Exposure ;
Sampling ;
Cleaning ;
Performance evaluation ;
Chemical analysis ;
Guidelines ;
Electron microscopy ;
Air pollution abatement ;
Air pollution effects(Humans) ;
Air pollution sampling ;
Air pollution detection ;
Procedures
|
Additional Subjects |
Asbestos dust ;
Air--Pollution--Measurement ;
Buildings ;
Air pollution control ;
Industrial hygiene ;
Public health ;
Exposure ;
Sampling ;
Cleaning ;
Performance evaluation ;
Chemical analysis ;
Guidelines ;
Electron microscopy ;
Air pollution abatement ;
Air pollution effects(Humans) ;
Air pollution sampling ;
Air pollution detection ;
Procedures
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EHAM |
EPA 600/4-85-049 |
|
Region 1 Library/Boston,MA |
05/25/2016 |
EJBD ARCHIVE |
EPA 600-4-85-049 |
|
Headquarters Library/Washington,DC |
03/04/2014 |
EJED |
EPA 600/4-85/049 |
|
OCSPP Chemical Library/Washington,DC |
03/07/2016 |
EKBD |
EPA/600/4-85-049 |
|
Research Triangle Park Library/RTP, NC |
06/01/1990 |
ERAD |
EPA-600/4-85-049 |
|
Region 9 Library/San Francisco,CA |
06/09/2016 |
ESAD |
EPA 600-4-85-049 |
3 copies |
Region 10 Library/Seattle,WA |
06/01/2016 |
NTIS |
PB86-129806 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
vi, 45 pages in various pagings : illustrations ; 28 cm |
Abstract |
One of the most critical points in an asbestos abatement project is knowing when the work has been completed, the contractor can be released, and the building can be reoccupied. This decision should be based on two factors: (1) satisfactory performance of the abatement work, and (2) thorough cleaning of the work site. As outlined herein, these factors should be evaluated by virtually inspecting the work site and by measuring the level of airborne asbestos there. The evaluation should be conducted by the asbestos program manager or the technical advisor assigned to monitor the abatement work. The report discusses various technical issues regarding the air test. Specifications are provided for air sampling and detailed guidelines are presented for using either TEM or PCM to analyze the samples. The information is designed for asbestos program managers and technical program advisors. |
Notes |
"November 1985." Includes bibliographical references (pages R-1-R-2). Final report. |