Record Display for the EPA National Library Catalog

RECORD NUMBER: 30 OF 134

Main Title Demonstration of Wellman-Lord/Allied Chemical FGD technology : demonstration test first year results /
Author Adams, R. C. ; Cotter, J. ; Milligan., S. W.
Other Authors
Author Title of a Work
Cotter, J. E.
Mulligan, S. W.
CORP Author TRW, Inc., Durham, NC.;Industrial Environmental Research Lab., Research Triangle Park, NC.
Publisher U.S. Environmental Protection Agency, Industrial Environmental Research Laboratory ; National Technical Information Service [distributor,
Year Published 1979
Report Number EPA-600/7-79-014b; EPA-68-02-1877
Stock Number PB80-146897
OCLC Number 08394897
Subjects Flue gases--Desulfurization ; Flue gases--Desulphurization
Additional Subjects Air pollution control ; Sulfur dioxide ; Boilers ; Coal ; Flue gases ; Combustion products ; Industrial wastes ; Performance evaluation ; Wellman process ; Flue gas desulfurization ; Coal fired power plants
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101E3I5.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD  EPA 600-7-79-014b c.1 Headquarters Library/Washington,DC 05/21/2014
EKBD  EPA-600/7-79-014b Research Triangle Park Library/RTP, NC 10/20/2009
ELBD ARCHIVE EPA 600-7-79-014b Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ESAD  EPA 600-7-79-014B Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB80-146897 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 96 p. in various pagings : ill. ; 27 cm.
Abstract
The report gives results of the first year of a comprehensive test program to demonstrate the capabilities of a full-scale plant using the Wellman-Lord/Allied Chemical process for desulfurizing flue gas. The FGD unit is retrofitted to Northern Indiana Public Service Company's 115 MW coal-fired unit No. 11 at the Dean H. Mitchell Station. During the demonstration, which began in September 1977, operating experience was limited by boiler- and FGD-related operating problems. At least 1 year of additional testing will follow completion of a number of design improvements that will eliminate or minimize the problems that have limited FGD plant use.
Notes
"TRW, Inc." "September 1979." Includes bibliographical references. "Contract no. 68-02-1877, program element no. EHE624A."