Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you have safely connected to the .gov website. Share sensitive information only on official, secure websites.

  • Environmental Topics
  • Laws & Regulations
  • Report a Violation
  • About EPA
Contact Us

Grantee Research Project Results

Energy Efficient Ethanol Stillage Treatment using a Bio-Electrochemical System

EPA Contract Number: EPD11085
Title: Energy Efficient Ethanol Stillage Treatment using a Bio-Electrochemical System
Investigators: Silver, Matt
Small Business: Cambrian Innovations / previously known as IntAct Laboratories, LLC
EPA Contact: Richards, April
Phase: II
Project Period: June 1, 2012 through May 31, 2014
Project Amount: $225,000
RFA: Small Business Innovation Research (SBIR) - Phase II (2011) Recipients Lists
Research Category: Small Business Innovation Research (SBIR) , SBIR - Biofuels and Vehicle Emissions Reduction

Description:

Reducing energy and water intensity of fuel-ethanol production is a critical national need, particularly if we are to realize the renewable fuel standards of 2010 mandating 36 million gallons of renewable fuels by 2022.  Because the ethanol tolerance of yeasts used in commercial cellulosic ethanol production is around 7-9% by volume, 10-14 gallons of stillage are created for every gallon of ethanol produced, resulting in billions of gallons of wastewater per year.  Yet existing stillage treatment solutions are costly and energy intensive.  Bio-electrochemical systems (BES) that can generate electricity during stillage treatment have the potential to greatly improve both the economics and carbon intensity of fuel-ethanol production.

Phase I feasibility analysis demonstrated for the first time, to our knowledge, the ability of bio-electrochemical systems to reduce BOD in ethanol stillage while generating electricity directly.  A proprietary cell achieved a maximum power density of 3.5 W/m3 on un-pretreated ethanol stillage at columbic efficiencies of 31% while removing 0.42 KG COD/m3day.  A multi-discipline, physics-based Metlab model demonstrated lower 10-year discounted cost of ownership versus competing systems at performances similar to those achieved in the lab, based in part on benefits not fully considered in the academic literature.

This Phase II project builds on Phase I results to optimize performance and demonstrate a scaled BES-based stillage treatment solution in partnership with some of the largest ethanol producers in the world.  The project is divided into four major tasks:

  • Broaden Scope:  Expand validated stillage streams to include cellulosic ethanol.
  • Detailed Design:  Verify design concepts developed to minimize cost at larger scale; modulate key parameters to minimize internal electrical and hydraulic resistances to increase treatment rates.
  • Process Optimization:  Pilot design in proposed process configuration to validate performance and determine proper pre-treatment characteristics.
  • Pareto-Optimization:  Incorporate empirical results into our multi-objective technical and economic model to identify pareto-optimal solutions, validate pilot economics, and inform future scaling efforts.

The end result will be commercial validation of a scalable BES treatment process with the potential to radically reduce the cost and energy intensity of ethanol stillage treatment.  Such a process could be used as a retrofill to older ethanol plants, incorporated into the ramp-up for cellulosic ethanol production, and also applied to other fermentation-based industries such as brewing.

Progress and Final Reports:

  • Final

  • SBIR Phase I:

    Bio-Electrochemical Systems for Ethanol Wastewater Treatment  | Final Report

    Top of Page

    The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Conclusions drawn by the principal investigators have not been reviewed by the Agency.

    Project Research Results

    • Final
    • SBIR Phase I | Final Report

    Site Navigation

    • Grantee Research Project Results Home
    • Grantee Research Project Results Basic Search
    • Grantee Research Project Results Advanced Search
    • Grantee Research Project Results Fielded Search
    • Publication search
    • EPA Regional Search

    Related Information

    • Search Help
    • About our data collection
    • Research Grants
    • P3: Student Design Competition
    • Research Fellowships
    • Small Business Innovation Research (SBIR)
    Contact Us to ask a question, provide feedback, or report a problem.
    Last updated April 28, 2023
    United States Environmental Protection Agency

    Discover.

    • Accessibility
    • Budget & Performance
    • Contracting
    • EPA www Web Snapshot
    • Grants
    • No FEAR Act Data
    • Plain Writing
    • Privacy
    • Privacy and Security Notice

    Connect.

    • Data.gov
    • Inspector General
    • Jobs
    • Newsroom
    • Open Government
    • Regulations.gov
    • Subscribe
    • USA.gov
    • White House

    Ask.

    • Contact EPA
    • EPA Disclaimers
    • Hotlines
    • FOIA Requests
    • Frequent Questions

    Follow.