Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you have safely connected to the .gov website. Share sensitive information only on official, secure websites.

  • Environmental Topics
  • Laws & Regulations
  • Report a Violation
  • About EPA
Contact Us

Grantee Research Project Results

Development of Community Power from Sustainable Small Hydro Power Systems – A Capacity Building Project in Bangang, Cameroon

EPA Grant Number: SU835067
Title: Development of Community Power from Sustainable Small Hydro Power Systems – A Capacity Building Project in Bangang, Cameroon
Investigators: Ileleji, Klein
Current Investigators: Ileleji, Klein , Lumkes, John , Chen, Jun , Gritza, Nadia
Institution: Purdue University
EPA Project Officer: Page, Angela
Phase: II
Project Period: August 15, 2011 through August 14, 2013
Project Amount: $75,000
RFA: P3 Awards: A National Student Design Competition for Sustainability Focusing on People, Prosperity and the Planet - Phase 2 (2011) Recipients Lists
Research Category: Pollution Prevention/Sustainable Development , P3 Challenge Area - Air Quality , P3 Awards , Sustainable and Healthy Communities

Objective:

The primary goal of Phase II is to fabricate and install the turbine designed in Phase I in Bangang, Cameroon. In Phase II, a team of students and a faculty advisor will embark on a 2-3 week trip to Bangang Cameroon. Two trips will be planned in Phase II. These trips will be part of Purdue Global Engineering Program Maymester Travel Abroad Global Design course.

Approach:

During the course of the semester, a team of student will work together to understand what it will take to build the turbine in 2 weeks in ACREST center, in Bangang using locally available materials. The target for the first trip is to have the turbine operational in 2 weeks. The target for the second trip will be to optimize the performance of the turbine via monitoring, and data collection. A proto-type to scale of the turbine will be fabricated and thoroughly tested by the team of students during the semester (Fall and Spring, 2012). Also, also travel planning arrangements will be made by the students, in addition to studying the work of the previous team conducted in Phase I. The fabrication and operation of the turbine will be documented via print (a building manual) and video which will be used as one of the technology transfer means to other communities in the region.

Expected Results:

The hydro-turbine developed in Phase I will be fabricated on-site in Bangang, Cameroon using locally sourced materials. Data of the performance tests will be collected and analyzed using appropriate engineering analysis tools. A second trip will be planned for extensive testing of the turbine, power generation and performance of the penstock. Demonstration of the turbine will be made to the community and ACREST staff. The project will be well documented by developing a hydro-turbine fabrication manual which would provide details using very simple/understandable graphical illustrations of the steps of “how to build a small-hydro power plant”. Technology transfer of our design will extend beyond ACREST. Therefore, the use of viral means of information delivery using various audio-visual modes of documentation and education will be explored. One mode of delivery will be made by documenting the site preparation, penstock construction, turbine fabrication and assembling, and testing/operation steps using video recordings which will be delivered on the web via UTube.

Publications and Presentations:

Publications have been submitted on this project: View all 2 publications for this project

Journal Articles:

Journal Articles have been submitted on this project: View all 1 journal articles for this project

Supplemental Keywords:

small hydropower, community power, appropriate technology,

Progress and Final Reports:

  • 2012 Progress Report
  • Final Report

  • P3 Phase I:

    Development of Community Power from Sustainable Small Hydro Power Systems – A Capacity Building Project in Bangang, Cameroon  | Final Report

    Top of Page

    The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Conclusions drawn by the principal investigators have not been reviewed by the Agency.

    Project Research Results

    • Final Report
    • 2012 Progress Report
    • P3 Phase I | Final Report
    2 publications for this project
    1 journal articles for this project

    Site Navigation

    • Grantee Research Project Results Home
    • Grantee Research Project Results Basic Search
    • Grantee Research Project Results Advanced Search
    • Grantee Research Project Results Fielded Search
    • Publication search
    • EPA Regional Search

    Related Information

    • Search Help
    • About our data collection
    • Research Grants
    • P3: Student Design Competition
    • Research Fellowships
    • Small Business Innovation Research (SBIR)
    Contact Us to ask a question, provide feedback, or report a problem.
    Last updated April 28, 2023
    United States Environmental Protection Agency

    Discover.

    • Accessibility
    • Budget & Performance
    • Contracting
    • EPA www Web Snapshot
    • Grants
    • No FEAR Act Data
    • Plain Writing
    • Privacy
    • Privacy and Security Notice

    Connect.

    • Data.gov
    • Inspector General
    • Jobs
    • Newsroom
    • Open Government
    • Regulations.gov
    • Subscribe
    • USA.gov
    • White House

    Ask.

    • Contact EPA
    • EPA Disclaimers
    • Hotlines
    • FOIA Requests
    • Frequent Questions

    Follow.