Grantee Research Project Results
2017 Progress Report: Shock-Resistant Biogas Digester for Cookstove Fuel
EPA Grant Number: SU836795Title: Shock-Resistant Biogas Digester for Cookstove Fuel
Investigators: Newton, Susan , Song, Ted
Current Investigators: Newton, Susan , Song, Ted , Bearden, Thomas , Belvardi, Mark , Clemenger, Anne , Perkins, Kyle , Terry, Grey , Keller, Joel , Gallegos, Fidel , Arauz, Kevin Mata , Magana, Vanessa , Cabral, Valeria Armendariz , Shorey, Wesley , Friesen, Alison
Institution: John Brown University
EPA Project Officer: Keating, Terry
Phase: I
Project Period: November 1, 2016 through October 31, 2017 (Extended to October 31, 2018)
Project Period Covered by this Report: November 1, 2016 through October 31,2017
Project Amount: $14,999
RFA: P3 Awards: A National Student Design Competition for Sustainability Focusing on People, Prosperity and the Planet (2016) RFA Text | Recipients Lists
Research Category: Sustainable and Healthy Communities , P3 Awards , P3 Challenge Area - Air Quality
Objective:
Every day guajeros scavenge throughout the Chimaltenango open dump, less than 10 miles from the Guatemala City dump of Guatemala. Often, these workers will stop at the end of their day to buy tortillas for their families from a street corner entrepreneur cooking over a makeshift stove. Burning whatever is flammable, often including toxin-infused trash, these stoves permeate the air of their already-polluted living quarters. Even entrepreneurs who can afford expensive firewood to cook tortillas breathe smoke-filled air for hours daily, resulting in chronic health issues, such as bronchitis, pneumonia, and chronic lung disease. This lack of clean fuel can be remedied by efficiently using methane gas with a simple biogas digester system. In order to guarantee the long-term viability of this system, operating conditions must be maintained to ensure the functionality of the biodigester.
The objective of the John Brown University (JBU) biogas team is to collaborate with a local not-for-profit (NFP) in Guatemala to create a user manual and training program based on an uniquely designed prototype. The key component of the biodigester designed by the JBU team is a monitoring system that allows users to efficiently observe and maintain operating conditions. The user manual and training program will assist local entrepreneurs in building and operating their own biodigesters. This program will provide locals with the opportunity to develop a marketable education focused on creating a sustainable and environmentally beneficial energy source for their community. The team will determine the contents of the manual by collecting data from several pilot projects, both in Guatemala and at the university.
The intended beneficiaries of this project are the impoverished communities living in the immediate vicinity of the dump. The solution will improve not only the living conditions in these communities but also provide them with increased economic opportunities. In order to empower these people, the JBU team will be operating through trusted NFP groups already working in the area.
Initially, the team will fund pilot projects at organizations such as the My Special Treasure (Mi Especial Tesoro), a home for young women who have come out of abusive situations in the Chimaltenango area. These projects will be sustained through constant long distance communication as well as periodic trips throughout the year. JBU has an established relationship with the Mi Especial Tesoro ministry, and JBU affiliates consistently travel there providing this partnership with a solid foundation.
The team will initially use the grant money to fund the purchase and construction of 3-5 biogas digesters for the local NFP groups and John Brown University's research team. The long-term goal of the project will be to supply the intended beneficiaries with knowledge through basic training, essential supplies, and an initial business plan. Through providing these materials, the JBU team hopes to establish a network of stable biogas producers that provide the community with a clean alternative fuel source for the future.
The vision of this project is to lower the number of deaths and diseases induced by air pollution while simultaneously boosting the economic health of the community by the founding of a locally sustained micro-biogas industry. The team hopes to do this through educating the local population on how to take advantage of alternative energy sources available in existing resources. As a side effect, this team will provide these communities a way to safely and effectively reallocate the waste contained in the dump.
Progress Summary:
The goal for Phase I was to design a working prototype out of inexpensive, globally available components, alongside a kit of electrical components that compose the monitoring system. This prototype will be used for preliminary testing and providing a framework for future designs to be scaled to the needs of the users. The team examined existing data and literature regarding biogas digestion technology in order to find ways to improve on existing designs. From this study, the benefits of existing biodigester styles were compared to the requirements specified by the original partner organization in Ethiopia. After the biodigester style was selected, the remaining requirements were defined to fill the needs of the project.
To validate our design hypotheses, computer-aided analysis and manual calculations were completed. The results of this analysis drove the decisions that eventually led to the design constructed. The prototype became a platform for the team to perform data collection and testing. Challenges encountered during the testing phase pointed to a lack of scientific data available on small-scale biodigester projects and led to the compilation of necessary future improvements.
After construction of the prototype, the initial challenge involved the logistics of filling a 250-gallon tank with manure and water. Substrate to water ratios previously used in larger tanks proved to be crippling to this model. Due to time constraints, the biodigester was only in operation for a short period. Infrared spectrometry of the resulting gas indicated that methane was produced but the feedstock composition, water ratios, and start up conditions will be optimized in Phase II.
Collected data from the monitoring system showed that the temperature of the biodigester changed less than 0.5 degrees Celsius over the period of an hour, and the pH did not alter more than 0.2 over the course of operation, meeting the requirements for bacterial growth [13]. After a change in substrate, the monitoring system detected pH below 6.2, which could have a toxic effect on the methanogenic bacteria.
Conclusions
The first phase of the project was acutely beneficial in providing the team with direction for future improvements. Due to the limited information resources on small-scale biodigestion, the team encountered roadblocks necessitating innovation in the design of the prototype. An example is the design of a unique, easy-to-implement sealing system for the gas output resolving the common issue of leakage in biodigester units by providing a component customized for this application. The restrictive size of the prototype upflow system resulted in inadequate mixing for the digestion process. Investigating the benefits of incorporating a mixing system led the team to propose the addition of a leak-resistant mechanism to the phase II prototype.
The monitoring system designed was proven to be accurate, reliable, and showed us that both the temperature and the pH of our system remained relatively constant over extended periods. A functional monitoring system will allow large amounts of data to be collected by the pilot projects during Phase II of this project. In the future, the team will process collected information from both Guatemala and the university in order to make informed conclusions about operation procedures, particularly in how certain substrates affect gas production. Publication on small-scale, upflow biodigesters, particularly in Guatemala, will supplement the deficiency in existing academic publications on the subject.
Future Activities:
The goal of Phase II is to further current research, increase use of biodigesters, and encourage community development through entrepreneurial activity. The current biodigester design will be optimized to eliminate issues encountered during Phase I. This will be accomplished through university experiments and pilot projects administered by partner organizations. In order to accomplish the objective of Phase II, an extensive resource manual will be developed to inform users on the construction and maintenance of a biodigester, as well as safety procedures for the storing and burning of biogas. Training sessions will be conducted to accompany the manual to provide the community with expertise in managing their new business endeavors.
Phase II will begin with detailed research and on-site fact gathering. Lab work will be conducted at JBU to collect data on how gas output volume and composition are affected by substrate type and concentration of slurry. Improvements on the biodigester design will include the addition of a leak-proof mixing system. The team will research and test whether different animal manures can be used to start up the biodigester. After sufficient data has been gathered, a detailed manual will be written and will include the practical results from the research and testing stages. The practical results will be organized into a component list, system costs, construction guide, installation guide, substrate analysis, troubleshooting guide, as well as additional sections. The team will provide both a Spanish translation of the manual and academic publishing of the research results. Finally, in coordination with partners in Guatemala, the improved biodigester system will be implemented as a pilot project at several locations near Chimaltenango. The Biogas Team from JBU will conduct tailored trainings on site in Guatemala with the help of local partners.
Journal Articles:
No journal articles submitted with this report: View all 3 publications for this projectSupplemental Keywords:
anaerobic digestion, biogas production, microprocessor controls, temperature sensing, pH sensing, respiratory health, renewable energy, Guatemala City Dump, GCD, not-for-profit, NFPProgress and Final Reports:
Original AbstractThe perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Conclusions drawn by the principal investigators have not been reviewed by the Agency.