STATUS OF EPA'S (ENVIRONMENTAL PROTECTION AGENCY'S) LIMB (LIMESTONE INJECTION MULTISTAGE BURNER) DEMONSTRATION PROGRAM AT OHIO EDISON'S EDGEWATER UNIT 4

Citation:

Hendriks, R. AND P. Nolan. STATUS OF EPA'S (ENVIRONMENTAL PROTECTION AGENCY'S) LIMB (LIMESTONE INJECTION MULTISTAGE BURNER) DEMONSTRATION PROGRAM AT OHIO EDISON'S EDGEWATER UNIT 4. U.S. Environmental Protection Agency, Washington, D.C., EPA/600/D-87/050 (NTIS PB87145348), 1987.

Description:

The paper describes and discusses the key design features of the retrofit of EPA's Limestone Injection Multistage Burner (LIMB) system to an operating, wall-fired utility boiler at Ohio Edison's Edgewater Station. It further describes results of the pertinent projects in EPA's LIMB program and shows how these results were used as the basis for the design of the system. The full-scale demonstration is expected to prove the effectiveness and cost of the LIMB concept for use on large-scale utility boilers. The equipment is now being installed at Edgewater, with system start-up scheduled for May 1987.

Record Details:

Record Type:DOCUMENT( REPORT )
Product Published Date:01/31/1987
Record Last Revised:12/22/2005
Record ID: 33067