Science Inventory

WASTE INFORMATION MODELING (WIM) FOR CONSTRUCTION OF THE BUILT ENVIRONMENT

Impact/Purpose:

According to the EPA, in 2007 over 164 million tons of construction and demolition waste was deposited in landfills. The construction methods, which create a large portion of this waste are a product of the software used to design them. Currently, architects use Building Information Modeling (BIM) to quickly design complex buildings. The construction techniques built into this software proliferate the use of these inefficient and wasteful methods. This proposal seeks to investigate and deploy methods for investigating construction methods using non-toxic industrial waste products to be integrated into BIM digital models. The intent of the project is to use digital manufacturing tools to demonstrate practical application for the re-use of the by-products of local industry.

Description:

The outcomes will include the construction of full-scale building prototypes. As full-scale pieces are constructed they will be installed throughout the community, and could potentially be used as installations within the local community to demonstrate the use of recycled products in inventive designs. This project seeks to capitalize on the plethora of recent advances in technology to pioneer a built environment that seamlessly weaves recycled waste with digital manufacturing to create a teaching tool for applied sustainability.

Record Details:

Record Type:PROJECT( ABSTRACT )
Start Date:08/15/2009
Completion Date:08/14/2010
Record ID: 249523