You are here:
ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL USEPA DEMONSTRATION PROJECT AT BIG SAUK LAKE MOBILE HOME PARK IN SAUK CENTRE, MN. SIX MONTH EVALUATION REPORT
Citation:
SHIAO, H., A. S. CHEN, W. E. CONDIT, AND L. WANG. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL USEPA DEMONSTRATION PROJECT AT BIG SAUK LAKE MOBILE HOME PARK IN SAUK CENTRE, MN. SIX MONTH EVALUATION REPORT. U.S. Environmental Protection Agency, Washington, DC, EPA/600/R-07/048 (NTIS PB2008-101561), 2007.
Impact/Purpose:
to inform the public
Description:
This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Big Sauk Lake Mobile Home Park (BSLMHP) in Sauk Centre, MN. The objectives of the project are to evaluate the effectiveness of Kinetico’s Macrolite® pressure filtration process in removing arsenic to meet the new arsenic maximum contaminant level (MCL) of 10 µg/L, the reliability of the treatment system, the required system operation and maintenance (O&M) and operator skill levels, and the capital and O&M cost of the technology. The project also is characterizing water in the distribution system and process residuals produced by the treatment system.