Jump to main content.


Process Information - Details

 
For information about the pollutants related to this process, click on the specific pollutant in the list below.
RBLC Home New Search Search Results Facility Information Process List Process Information


Help

FINAL

RBLC ID: TX-0618
Corporate/Company: CHANNEL ENERGY CENTER LLC
Facility Name: CHANNEL ENERGY CENTER LLC
Process: Combined Cycle Turbine

Primary Fuel:   natural gas
Throughput:   180.00 MW
Process Code:   15.210
 
 
 

Pollutant Information - List of Pollutants Help


Pollutant Primary Emission Limit Basis Verified
Carbon Monoxide 4.0000 PPMVD BACT-PSD UNKNOWN
Nitrogen Oxides (NOx) 2.0000 PPMVD LAER UNKNOWN
Particulate matter, total (TPM) 27.0000 LB/H BACT-PSD UNKNOWN
Particulate matter, total < 10 µ (TPM10) 27.0000 LB/H BACT-PSD UNKNOWN
Particulate matter, total < 2.5 µ (TPM2.5) 27.0000 LB/H BACT-PSD UNKNOWN
Volatile Organic Compounds (VOC) 2.0000 PPMVD BACT-PSD UNKNOWN
   
Process Notes:   The turbine is a Siemens 501F rated at a nominal 180 MW and the duct burner will have a maximum design heat input of 475 MMBtu/hr.

Jump to main content.