Jump to main content.

Search Results : EPA National Library Catalog

Items Found: 43

Showing: Items 1 - 43

Your Search: (SUBJECT=Fossil fuel combustion wastes)

Sort Results:

     Choose a Library:
(CTRL-CLICK for multiple libraries)
     Choose a Collection:
(CTRL-CLICK for multiple collections)

Select Item Title Year Published
  1 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): American Electric General James Gavin Power Plant, Cheshire, Ohio. 2009
  2 Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report). 2009
  3 Bottom Ash Pond, Trimble County Station Assessment Report. Draft Report. 2009
  4 CCW Impoundment Assessment Report. Bruce Mansfield Power Plant, Beaver County, Pennsylvania. 2009
  5 CCW Impoundment Inspection Report: Gorgas Steam Plant, Walker County, Alabama. 2009
  6 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  7 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  8 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  9 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  10 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
  11 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
  12 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
  13 Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
  14 Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
  15 Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
  16 Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
  17 Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
  18 Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
  19 Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
  20 Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
  21 Coal Combustion Waste Management at Landfills and Surface Impoundments, 1994-2004. 2006
  22 Dam Safety Assessment of CCW Impoundments. LG&E Mill Creek Station Report. Final Report. 2009
  23 Dam Safety Assessment of CCW Impoundments. Possum Point Power Station. Final Report. 2010
  24 Dam Safety Assessment of CCW Impoundments. Wabash River Generating Station. 2010
  25 Dam Safety Assessment of CCW Impoundments. WH Zimmer Station. 2010
  26 Dam Safety Assessment of CCW Impoundments: Bremo Power Station. 2010
  27 Dam Safety Assessment of CCW Impoundments: Chesapeake Energy Center. 2010
  28 Dam Safety Assessment of CCW Impoundments: Chesterfield Power Station. 2010
  29 Dam Safety Assessment of CCW Impoundments: Joppa Plant. 2010
  30 Dam Safety Assessment of CCW Impoundments: LG&E Mill Creek Station Report. Draft Report. 2009
  31 Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Draft Report. 2009
  32 Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Final Report. 2009
  33 Dam Safety Inspection Report: Dan River Steam Station, Rockingham County, North Carolina. Draft Report. 2009
  34 Dam Safety Inspection Report: Gorgas Steam Plant, Walker County, Alabama. Draft Report. 2009
  35 Lower Ash Pond Dam, A.B. Brown Station Assessment Report. Draft Report. 2009
  36 Mountaineer Bottom Ash Complex Report. Draft Report. 2009
  37 Report of Geotechnical Assessment of Coal Combustion Surface Impoundments: Minnesota Power Boswell Energy Center, Cohasset, MN. 2010
  38 Specific Site Assessment for Coal Combustion Waste Impoundments at Duke Energy Indiana (DEI) Gibson Generating Station, Owensville, Indiana. 2010
  39 Tanner's Creek Bottom Ash Complex Assessment Report. 2009
  40 Tanner's Creek Bottom Ash Complex Assessment Report. Draft Report. 2009
  41 Tanner's Creek Fly Ash Pond Assessment Report. 2009
  42 Tanner's Creek Fly Ash Pond Assessment Report. Draft Report. 2009
  43 Upper Ash Pond Dam, A.B. Brown Station Assessment Report. Draft Report. 2009



Save, Print or Email Selected Records
Select Records Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
 
Action
Email Selected Records To:

Local Navigation


Jump to main content.