Jump to main content.

Search Results : EPA National Library Catalog

Items Found: 30

Showing: Items 1 - 30

Your Search: (SUBJECT=Field assessments)

Sort Results:

     Choose a Library:
(CTRL-CLICK for multiple libraries)
     Choose a Collection:
(CTRL-CLICK for multiple collections)

Select Item Title Year Published
  1 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): American Electric General James Gavin Power Plant, Cheshire, Ohio. 2009
  2 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): Northern States Power Company Minnesota, Sherburne County Power Station, Becker, Minnesota. (Final Report). 2009
  3 Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report). 2009
  4 Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service, Cholla Power Plant. Draft Final. 2009
  5 Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service: Cholla Power Plant. 2009
  6 Coal Ash Impoundment Specific Site Assessment Report: PPL Montana, Colstrip Power Plant, Units 1 and 2 Bottom Ash Ponds; Units 1 and 2 'A' Fly Ash Pond; Units 1 and 2 Stage Two Evaporation Pond (STEP); and Units 3 and 4 Effluent Holding Ponds. Draft. 2009
  7 Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam. 2009
  8 Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center. 2009
  9 Coal Ash Impoundment--Specific Site Assesment Report, Tri-State Generation and Transmission Association. Escalante Generating Station. 2009
  10 Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised). 2009
  11 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  12 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  13 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  14 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  15 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
  16 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
  17 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
  18 Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
  19 Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
  20 Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
  21 Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
  22 Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
  23 Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
  24 Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
  25 Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
  26 Specific Site Assessment for Coal Ash Impoundments at Arizona Public Service (APS) Four Corners Power Plant, Lined Ash Impoundment, Lined Decant Water Impoundment, Fruitland, New Mexico. Draft. 2009
  27 Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft. 2009
  28 Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, Arizona. Draft Final. 2009
  29 Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, AZ. Final Report. 2009
  30 Specific Site Assessment Report: Tri-State Generation and Transmission Association, Escalante Generation Station. Draft. 2009



Save, Print or Email Selected Records
Select Records Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
 
Action
Email Selected Records To:

Local Navigation


Jump to main content.