Search Results : EPA National Library Catalog

Items Found: 209

Showing: Items 1 - 50

Your Search: (SUBJECT=Electric power production)

Sort Results:
Choose a Library:
(CTRL-CLICK for multiple libraries)
Choose a Collection:
(CTRL-CLICK for multiple collections)
1 2 3 4 5 NEXT

Select Item Title Year Published
  1 Abatement of Sulfur Oxide Emissions from Stationary Combustion Sources. 1970
  2 Acid rain & electric utilities II : proceedings of a specialty conference sponsored by the Air & Waste Management Association, January 21-22, 1997, Scottsdale, AZ. 1997
  3 Acid rain & electric utilities permits, allowances, monitoring, & meteorology / {electronic resource} : 1995
  4 Advanced utility simulation model project summary / {microform} : 1992
  5 Air pollution aspects of emission sources: electric power production - a bibliography with abstracts. 1971
  6 Allocation of CO2 emission allowances in the Regional Greenhouse Gas cap-and-trade program 2005
  7 Alternative technologies for power production : prepared for the Electric Power Task Force of the Scientists' Institute for Public Information and the Power Study Group of the American Association for the Advancement of Science Committee on Environmental Alterations 1975
  8 Analysis of electric generation & energy use in the Susquehanna River Basin, 1979 1981
  9 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report. PacifiCorp, Naughton Power Station, Kemmerer, Wyoming. 2009
  10 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): American Electric General James Gavin Power Plant, Cheshire, Ohio. 2009
  11 Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Eagle Valley Generating Station. 2010
  12 Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Harding Street Generating Station. 2010
  13 Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Petersburg Generating Station. 2010
  14 Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report). 2009
  15 Assessment of the use of chemical reaction systems in electric utility applications 1979
  16 Bottom Ash Pond, Trimble County Station Assessment Report. Draft Report. 2009
  17 Bureau of Mines and energy program, 1971, 1972
  18 California Climate Action Registry general reporting protocol reporting entity-wide greenhouse gas emissions / [electronic resource] : 2009
  19 Capital requirements and busbar costs for power in the Ohio River basin, 1985 and 2000 1980
  20 CCW Impoundment Assessment Report. Bruce Mansfield Power Plant, Beaver County, Pennsylvania. 2009
  21 CCW Impoundment Inspection Report: Gorgas Steam Plant, Walker County, Alabama. 2009
  22 CCW Impoundments Inspection Report: Bruce Mansfield Power Plant, Beaver County, Pennsylvania. Draft Report. 2009
  23 CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Draft Report. 2009
  24 CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Final Report. 2009
  25 CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Draft Report. 2009
  26 CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Final Report. 2009
  27 Chemistry for energy : based on a symposium sponsored by the Chemical Institute of Canada at the annual CIC conference, Winnipeg, June 5-7, 1978 1979
  28 Clean power, green jobs a national renewable electricity standard will boost the economy and protect the environment / [electronic resource] : 2009
  29 Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center. 2009
  30 Coal Ash Impoundment--Specific Site Assesment Report, Tri-State Generation and Transmission Association. Escalante Generating Station. 2009
  31 Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised). 2009
  32 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  33 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  34 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  35 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  36 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
  37 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
  38 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
  39 Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
  40 Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
  41 Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
  42 Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report. 2009
  43 Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
  44 Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
  45 Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
  46 Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
  47 Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
  48 Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report. 2009
  49 Cogeneration of electricity and useful heat 1979
  50 Combustion Power Unit-400: Cpu-400. 1969
1 2 3 4 5 NEXT
Save, Print or Email Selected Records
Select Records Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
 
Action
Email Selected Records To: