Jump to main content.

Search Results : EPA National Library Catalog

Items Found: 58

Showing: Items 1 - 50

Your Search: (SUBJECT=Coal wastes)

Sort Results:

     Choose a Library:
(CTRL-CLICK for multiple libraries)
     Choose a Collection:
(CTRL-CLICK for multiple collections)
1 2 NEXT

Select Item Title Year Published
  1 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report. PacifiCorp, Naughton Power Station, Kemmerer, Wyoming. 2009
  2 Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): American Electric General James Gavin Power Plant, Cheshire, Ohio. 2009
  3 Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Eagle Valley Generating Station. 2010
  4 Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Harding Street Generating Station. 2010
  5 Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Petersburg Generating Station. 2010
  6 Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report). 2009
  7 Bottom Ash Pond, Trimble County Station Assessment Report. Draft Report. 2009
  8 Bottom Ash Pond--Trimble County Station Assessment Report. 2009
  9 CCW Impoundment Assessment Report. Bruce Mansfield Power Plant, Beaver County, Pennsylvania. 2009
  10 CCW Impoundment Inspection Report: Gorgas Steam Plant, Walker County, Alabama. 2009
  11 CCW Impoundments Inspection Report: Bruce Mansfield Power Plant, Beaver County, Pennsylvania. Draft Report. 2009
  12 CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Draft Report. 2009
  13 CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Final Report. 2009
  14 CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Draft Report. 2009
  15 CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Final Report. 2009
  16 Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center. 2009
  17 Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised). 2009
  18 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  19 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  20 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
  21 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
  22 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
  23 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
  24 Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
  25 Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
  26 Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
  27 Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
  28 Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report. 2009
  29 Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
  30 Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
  31 Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
  32 Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
  33 Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
  34 Coal Combustion Waste Impoundment Round 7-Dam Assessment Report. Ottumwa Generating Station, Ash Impoundment Dikes, Interstate Power and Light Company, Ottumwa, Iowa. 2011
  35 Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report. 2009
  36 Dam Safety Assessment of CCW Impoundments, Sunbury Generation LP. 2010
  37 Dam Safety Assessment of CCW Impoundments. LG&E Mill Creek Station Report. Final Report. 2009
  38 Dam Safety Assessment of CCW Impoundments. Possum Point Power Station. Final Report. 2010
  39 Dam Safety Assessment of CCW Impoundments. Wabash River Generating Station. 2010
  40 Dam Safety Assessment of CCW Impoundments. WH Zimmer Station. 2010
  41 Dam Safety Assessment of CCW Impoundments: Bremo Power Station. 2010
  42 Dam Safety Assessment of CCW Impoundments: Chesapeake Energy Center. 2010
  43 Dam Safety Assessment of CCW Impoundments: Chesterfield Power Station. 2010
  44 Dam Safety Assessment of CCW Impoundments: Joppa Plant. 2010
  45 Dam Safety Assessment of CCW Impoundments: LG&E Mill Creek Station Report. Draft Report. 2009
  46 Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Draft Report. 2009
  47 Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Final Report. 2009
  48 Dam Safety Inspection Report: Dan River Steam Station, Rockingham County, North Carolina. Draft Report. 2009
  49 Dam Safety Inspection Report: Gorgas Steam Plant, Walker County, Alabama. Draft Report. 2009
  50 Lower Ash Pond Dam, A.B. Brown Station Assessment Report. Draft Report. 2009
1 2 NEXT



Save, Print or Email Selected Records
Select Records Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
 
Action
Email Selected Records To:

Local Navigation


Jump to main content.