Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 185
Showing: Items 51 - 100
Your Search: (SUBJECT=Contractors)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 4 Library/Atlanta,GA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
PREV
1
2
3
4
NEXT
Select Item
Title
Year Published
51
Course 1. Model Curriculum for Training Asbestos Abatement Contractors and Supervisors (Training Manual).
1992
52
Criminal investigations and the superfund program. {microfiche}
1990
53
Debarment and suspension. /
1991
54
Debarment and suspension. /
1989
55
Deletion of EPA order 1900.2 - "contracting at EPA" and EPA order 1910.1 - "guidance on emergency procurements" /
1996
56
Demonstration of Three Recirculating Swine Waste Management Systems.
1973
57
Economic impact analysis for proposed comprehensive procurement guideline III.
1998
58
Emergency responders agreements for fund-lead remedial actions.
1994
59
Emergency response cleanup services contracts (ERCS) : user's manual /
1990
60
Environmental cleanup : inconsistent sharing arrangements may increase Defense costs : report to the Chairman, Legislation and National Security Subcommittee, Committee on Government Operations, House of Representatives /
1994
61
Environmental cleanup at DOD : better cost-sharing guidance needed at government-owned, contractor-operated sites : report to the Subcommittee on National Security, International Affairs, and Criminal Justice, Committee on Government Reform and Oversight, House of Representatives /
1997
62
Environmental Protection Agency should better manage its use of contractors report to the Chairman, Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives /
1985
63
EPA (Environmental Protection Agency) Design Information Report: Consideration of First-Stage Organic Overloading in Rotating Biological Contactor Design.
1985
64
EPA contract management problems : hearing before the Committee on Governmental Affairs, United States Senate, One Hundred Third Congress, first session, June 22, 1993.
1993
65
EPA Lacks Processes to Validate Whether Contractors Receive Specialized Role-Based Training for Network and Data Protection /
2017
66
EPA Needs to Strengthen Oversight of Government Furnished Property.
2006
67
EPA order : use of contractor services to avoid improper contractor relationships.
1994
68
EPA Should Improve Its Contractor Performance Evaluation Process for Contractors Receiving Recovery Act Funds. Audit Report.
2010
69
EPA should increase fixed-price contracting for remedial actions /
2013
70
EPA, contract mismanagement : hearings before the Subcommittee on Oversight and Investigations of the Committee on Energy and Commerce, House of Representatives, One Hundred Second Congress, second session, March 4, 19, and July 8, 1992.
1992
71
EPA/U.S. Army Corps of Engineers payment process, direct cite/revised reimbursement methods.
1990
72
EPA/USACE payment process, direct cite/revised reimbursement methods.
1990
73
EPA/USACE Payment Process: Direct Cite/Revised Reimbursement Methods.
1990
74
Evaluation of Fabric Filter as Chemical Contactor for Control of Sulfur Dioxide from Flue Gas.
1969
75
Examination of costs claimed under EPA cooperative agreements 2A-96104501 and 2A-96107201 awarded under the Recovery Act to Chelsea Collaborative Inc., Chelsea, Massachusetts /
2013
76
Expanded bed biological treatment /
1978
77
Federal GOCO facilities reported in the toxic chemical release inventory system (TRIS) : Section 313 of the Emergency Planning and Community Right-to-Know Act (EPCRA) /
1991
78
Fraud Controls for EPA's Contract Laboratory Program Are Adequate, but Can Be Strengthened with Formal Risk Assessment and Investigative Information Sharing /
2017
79
General Enforcement Policy Compendium. Volume 1.
1994
80
Government contractors selected agencies' efforts to identify organizational conflicts of interest : report to Congressional committees /
1995
81
Guidance for ambient air monitoring at Superfund sites.
1993
82
Guidance on expediting remedial design and remedial action.
1990
83
Guide for Control of Government Property by Contractors.
1973
84
Guidelines for Brownfields Assement Grants, FY13.
2012
85
Guidelines for Brownfields Cleanup Grants, FY13.
2012
86
Guidelines for Brownfields Revolving Loan Fund (RLF) Grants, FY13.
2012
87
Hazardous Educational Waste Collections in Illinois.
1997
88
Health and safety guide for plumbing, heating, and air conditioning contractors.
1975
89
Implementation of the decentralized contractor performance evaluation and award fee process for selected remedial program contracts.
1987
90
Implementation of the superfund alternative remedial contracting strategy (ARCS) : report of the administrator's task force ; implementation plan /
1991
91
Implementing the mentoring program for newly-hired OSCs/RPMs : Superfund management review implementation product (recommendation #458.1) /
1989
92
Improved contract administration needed for the customer technology solutions contract /
2013
93
Initiatives to streamline the alternative remedial contracting strategy (ARCS) contracts' award fee process.
1992
94
Innovative Clean-up Approaches: Investments in Technology Development, Results & Outlook for the Future (Announcement)
1999
95
Instructions for Performing the Annual Allocation of Non-Site-Specific Costs.
1999
96
Interacting with contractors (interim policy).
2008
97
Interacting with contractors.
2011
98
Interim guidelines for the use of on-site contractors /
1992
99
Inventory of treatability study vendors.
1990
100
Joint Corps/EPA guidance.
1983
PREV
1
2
3
4
NEXT
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)