Search Results for the EPA National Library Catalog

Items Found: 3439
Showing: Items 551 - 600
Your Search: (SUBJECT=Coal)


 
 
 
PREV 1 ... 7 8 9 10 11 12 13 14 15 16 17 ... 69 NEXT
Select Item Title Year Published
Coal and the Environment Abstract Series. Bibliography on Disposal of Refuse from Coal Mines and Coal Cleaning Plants. 1978
Coal and the Environment Abstract Series. Mine Drainage Bibliography 1910-1976. 1977
Coal and the Environment Abstract Series: Bibliography on Disposal of Mine and Cleaning Plant Refuse. 1981
Coal as an energy resource conflict and consensus. 1977
Coal ash disposal : solid waste impacts 1980
Coal ash disposal manual : final report, December 1979 1979
Coal ash disposition in Maryland, 1950 through 1980 1982
Coal Ash Impoundment - Specific Site Assessment, PacifiCorp Energy: Jim Bridger Power Station. 2009
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service, Cholla Power Plant. Draft Final. 2009
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service: Cholla Power Plant. 2009
Coal Ash Impoundment Specific Site Assessment Report: PPL Montana, Colstrip Power Plant, Units 1 and 2 Bottom Ash Ponds; Units 1 and 2 'A' Fly Ash Pond; Units 1 and 2 Stage Two Evaporation Pond (STEP); and Units 3 and 4 Effluent Holding Ponds. Draft. 2009
Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam. 2009
Coal Ash Impoundment- Specific Site Assessment Report: Arizona Public Service, Four Corners Power Plant. 2009
Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center. 2009
Coal Ash Impoundment--Specific Site Assesment Report, Tri-State Generation and Transmission Association. Escalante Generating Station. 2009
Coal ash utilization : fly ash, bottom ash, and slag / 1978
Coal bed methane primer : new source of natural gas - environmental implications, background and development in the Rocky Mountain West / 2004
Coal cleaning handbook. 1981
Coal Cleaning Options for SO2 Emission Reduction. 1985
Coal Cleaning Plant Prototype Plant Design Drawings. Part 8. 1969
Coal Cleaning Plant Prototype Plant Specifications. Part 7. 1969
Coal cleaning technology 1981
Coal cleaning with scrubbing for sulfur control : an engineering economic summary / 1977
Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised). 2009
Coal combustion and conversion technology 1984
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond Progress Energy, Roxboro, North Carolina, Site 9. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 7, 1982 Pond and 1964 Pond Progress Energy Carolina, Asheville, North Carolina. Project No. 0-381, Assessment of Dam Safety Coal Combustion Surface Impoundments for the REAC Program. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Round 7-Dam Assessment Report. Ottumwa Generating Station, Ash Impoundment Dikes, Interstate Power and Light Company, Ottumwa, Iowa. 2011
Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report. 2009
Coal combustion waste manual : evaluating impacts to fish and wildlife / 1981
Coal composition, coal plasticity, and coke strength, 1973
Coal conversion and the environment : chemical, biomedical, and ecological considerations : proceedings of the Twentieth Annual Hanford Life Sciences Symposium at Richland, Washington, October 19-23, 1980 / 1981
Coal conversion comparisons : final report, task 002 / 1979
Coal conversion control technology / 1979
PREV 1 ... 7 8 9 10 11 12 13 14 15 16 17 ... 69 NEXT

Save, Print or Email Selected Records