| Main Title |
Analysis of energy projections and implications for resource requirements : prepared for Missouri River Basin Commission, Yellowstone level B study. |
| CORP Author |
Harza Engineering Company; Missouri. River Basin Commission. |
| Publisher |
Harza Engineering Co., |
| Place Published |
Chicago : |
| Year Published |
1976 |
| OCLC Number |
04639302 |
| Subjects |
Power resources--Yellowstone River Valley;
Coal mines and mining--Environmental aspects--Yellowstone River Valley;
Power resources--United States
|
| Holdings |
| Library |
|
Call Number |
Additional Info |
Location |
Date Modified |
| EOAD |
|
00003633 |
|
Region 8 Technical Library/Denver,CO |
01/01/1988 |
|
| Notes |
Includes bibliographical references. |
| PUB Date Free Form |
1976. |
| Document Type |
BC |
| LCCN |
78622067 |
| Cataloging Source |
OCLC/U |
| Origin |
OCLC |
| Type |
CAT |