Skip common site navigation and headers
United States Environmental Protection Agency
National Pollutant Discharge Elimination System (NPDES)
Begin Hierarchical Links EPA Home > OW Home > OWM Home > NPDES Home > Stormwater > Measurable Goals End Hierarchical Links
Construction Activities
- 2003 Construction General Permit
- Oil and Gas
 
Industrial Activity
- Multi-Sector General Permit
 
Municipal MS4s
- Large & Medium
- Small
 
Stormwater Outreach Materials
 
Phase I & Phase II
- Menu of BMPs
- Urbanized Area Maps
 
 
 
Stormwater Home

 

NPDES Topics Alphabetical Index Glossary About NPDES

Part 3. Examples of Phase II BMPs and Associated Measurable Goals

OVERVIEW

The following hypothetical examples illustrate how measurable goals could be used to track and document program effectiveness at reducing pollutants to the MEP. EPA does not attempt to develop guidance on measurable goals for every potential BMP. Therefore, these examples represent only selected portions of a Phase II storm water management program and are not intended to serve as examples of comprehensive programs. To aid in the formulation of your measurable goals, EPA has developed a list of measurable parameters to provide you with some ideas about the types of measurements that can be made. This list is not comprehensive and is meant to be a guide only.

The BMP and measurable goal examples described in this section provide links to the Menu of BMPs, which includes detailed fact sheets describing each BMP.

BMP EXAMPLES

National Pollutant Discharge Elimination System Home

Measurable Goals Information
Measureable Goals Home

Part 1: Background & Regulatory Context

Part 2: Process for Developing Measurable Goals Under a General Permit

Part 3: Examples of Phase II BMPs & Associated Measurable Goals

Part 4: Process for Developing a Storm Water Management Program

Part 5: Environmental Indicators for Storm Water Programs

Downloadable PDF Version

Menu of BMPs

 
 Register to Receive NPDES News Alerts!  
Adobe Acrobat Reader Icon
The documents on this site are best viewed
with Acrobat 5.0

 

Office of Water | Office of Wastewater Management | Disclaimer | Search EPA

Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us

Last updated on October 30, 2007 9:08 AM
URL:http://cfpub.epa.gov/npdes/stormwater/measurablegoals/part3.cfm