Construction Site Storm Water Runoff Control
BMP INSPECTION AND MAINTENANCE
The frequency of inspection and maintenance of BMPs.
The number of failed storm water BMPs.
The number of BMPs reported to be in need of repair.
Whether or not an inventory of inspection and maintenance activities was created and is regularly maintained.
BRUSH BARRIER
The number of brush barriers installed.
The number of construction sites with brush barriers.
The amount of sediment collected brush barriers.
The frequency of inspection and maintenance of brush barrier installations.
Suspended solids levels at the site outfall.
CHECK DAMS
The number of check dams installed.
The number of construction sites that have check dams.
The reduction in runoff quantity.
The frequency of inspection and maintenance of check dam installations.
The amount of sediment collected.
Suspended solids levels at the site outfall.
CHEMICAL STABILIZATION
The number of personnel trained to apply chemicals.
Suspended solids levels at the site outfall.
The frequency of chemical reapplication.
The number of construction sites that use chemical stabilization.
CONSTRUCTION ENTRANCES
The frequency of inspection and maintenance of construction entrances.
The amount of sediment collected at construction entrances.
Suspended solids levels at the site outfall.
Whether or not an ordinance was developed that requires special construction entrances.
CONSTRUCTION REVIEWER
The number of trained inspectors.
Whether or not an ordinance was developed requiring that sites be inspected.
The number of inadequate sites/plans reported by inspectors.
The number of non-compliant permits reported.
CONSTRUCTION SEQUENCING
Whether or not an ordinance was developed that requires construction sequencing.
The number of construction sites that practice sequencing.
Suspended solids levels at the site outfall.
CONTRACTOR CERTIFICATION AND INSPECTOR TRAINING
The number of certified contractors.
The number of training and certification programs offered.
Whether or not an ordinance requiring certification was developed.
Whether or not an incentives program for certified contractors and inspectors was developed.
The number of certified inspectors.
The number of sites inspected.
Changes in water quality at inspected sites.
DUST CONTROL
Suspended solids levels at the site outfall or in nearby receiving waters.
FILTER BERMS
The number of filter berms installed.
The number of construction sites with filter berms.
The frequency of inspection and maintenance of filter berms.
Suspended solids levels at the site outfall.
GENERAL CONSTRUCTION SITE WASTE MANAGEMENT
Whether or not an ordinance was developed to ensure that all regulations are followed for material storage, disposal, etc.
Water quality at the site outfall.
The frequency of inspection and maintenance activities.
GEOTEXTILES
The number of geotextile installations at construction sites.
The number of construction sites that use geotextiles.
The frequency of inspection and maintenance of geotextile installations.
Suspended solids levels at the site outfall.
GRADIENT TERRACES
The number of gradient terrace installations at construction sites.
The number of construction sites that use gradient terraces.
The frequency of inspection and maintenance of gradient terraces.
Suspended solids levels at the site outfall.
GRASS-LINED CHANNELS
The number of grass-lined channels installed.
The number of construction sites that use grass-lined channels.
The frequency of inspection and maintenance of grass-lined channels.
The reduction in runoff quantity.
Water quality at the site outfall.
LAND GRADING
The number of construction sites that use better land grading practices.
Suspended solids levels at the site outfall.
MODEL ORDINANCES
Whether or not an ordinance was developed to address construction site runoff control.
The number of enforcement actions taken.
The number of stop work orders given.
The number of bonding requirements set.
MULCHING
The amount of exposed soils protected with mulch.
The number of construction sites that use mulching.
Suspended solids levels at the site outfall.
PERMANENT DIVERSIONS
The number of permanent diversions installed.
The number of construction sites that use permanent diversions.
The amount of runoff reduced.
The frequency of inspection and maintenance of permanent diversions.
Water quality at the site outfall.
PERMANENT SEEDING
The amount of seeded area.
The number of construction sites that use permanent seeding.
The frequency of inspection and maintenance of seeded areas.
Suspended solids levels at the site outfall.
PRESERVING NATURAL VEGETATION
The amount of naturally vegetated land area preserved.
The number of construction sites that preserve natural vegetation.
Whether or not an ordinance was developed that requires that some natural vegetation be preserved at construction sites.
Water quality at the site outfall.
RIPRAP
The number of riprap installations.
The number of construction sites that use riprap.
Suspended solids levels at the site outfall.
The frequency of inspection and maintenance of riprap installations.
The reduction in runoff velocity.
SEDIMENT FILTERS AND SEDIMENT CHAMBERS
The number of sediment filters and chambers installed.
The number of construction sites that use sediment filters and chambers.
The frequency of inspection and maintenance of sediment filters and chambers.
Water quality at the site outfall.
The acreage of disturbed land that drains to sediment filters and chambers.
The amount of sediment collected in filters and chambers.
SEDIMENT TRAPS
The number of sediment traps installed.
The number of construction sites that use sediment traps.
The amount of sediment collected in sediment traps.
Suspended solids levels at the site outfall.
The frequency of inspection and maintenance of sediment traps.
SEDIMENT BASINS AND ROCK DAMS
The number of sediment basins and rock dams installed.
The number of construction sites that use sediment basins and rock dams.
The amount of sediment collected in sediment basins.
Suspended solids levels at the site outfall.
The frequency of inspection and maintenance of sediment basins and rock dams.
SILT FENCE
The amount of silt fence installed.
The number of construction sites that use silt fences.
The amount of sediment collected by silt fences.
The frequency of inspection and maintenance of silt fences.
Suspended solids levels at the site outfall.
SODDING
The amount of disturbed land protected by sod installations.
The number of construction sites that use sodding.
The frequency of inspection and maintenance of sod installations.
Suspended solids levels at the site outfall.
SOIL ROUGHENING
The amount of disturbed land protected by soil roughening.
The number of construction sites that use soil roughening.
Suspended solids levels at the site outfall.
SOIL RETENTION
The number of soil retaining structures installed.
The number of construction sites with soil retaining structures.
Suspended solids levels at the site outfall.
The frequency of inspections to ensure that no erosion is occurring.
SPILL PREVENTION AND CONTROL PLAN
The number of reported spills.
Whether or not an ordinance for storage of high-risk chemicals was developed.
The number of personnel trained in spill response.
STORM DRAIN INLET PROTECTION
The number of storm drain inlets protected.
The number of construction sites that use storm drain inlet protection.
The amount of sediment collected.
Suspended solids levels at the site outfall.
The frequency of inspection and maintenance of storm drain inlets.
TEMPORARY DIVERSION DIKES
The number of temporary diversion dikes installed.
The number of construction sites that use temporary diversion dikes.
The reduction in runoff quantity at the site outfall.
Suspended solids levels at the site outfall.
The amount of sediment collected by temporary diversion dikes.
outfall.
TEMPORARY SLOPE DRAIN
The number of temporary slope drains installed.
The number of construction sites that have temporary slope drains.
Suspended solids levels at the site outfall.
The frequency of inspection and maintenance of temporary slope drains.
TEMPORARY STREAM CROSSINGS
The number of temporary stream crossings installed.
The frequency of inspection and maintenance of temporary stream crossings.
Suspended solids levels at the site
VEGETATED BUFFER
The number of vegetated buffers installed.
The number of construction sites with vegetated buffers.
Changes in water quality of runoff leaving buffer areas.
The reduction in runoff quantity.
The frequency of inspection and maintenance of vegetated buffers.
VEHICLE MAINTENANCE AND WASHING AREAS
Water quality at the site outfall.
Whether or not construction vehicles are regularly inspected.
The number of vehicle wash areas on-site.
The number of construction sites with designated vehicle maintenance and washing areas.
WIND FENCES AND SAND FENCES
The number of fences installed.
The number of construction sites that use fences.
The frequency of inspection and maintenance of wind and sand fences.
Suspended solids levels at the site outfall.
|