|
 |
|
Permit Issuance Process Policy and Guidance Documents
* Files are best viewed in Internet Explorer and Adobe 8.0 or higher.
- Additional Questions on Enforcement Compliance Schedule Letters (PDF)
(336KB)
Response to transmitting "Additional Suggested Questions on Enforcement Compliance Schedule Letters." Further clarification on the use of enforcement compliance schedule letters.
Date Published:
04/01/1977
- Alternative in Permit Language (PDF)
(57KB)
Provides permit language for the definitions of the daily maximum and daily average permit limits.
Date Published:
12/27/1973
- Applicability of General Permits to New Sources (PDF)
(90KB)
Procedures to be followed if a general permit is to cover new sources. General permits can include new sources, but only after NEPA requirements are fulfilled.
Date Published:
12/21/1982
- Applicability of Revised NPDES Regulations to Permits Currently Being Processed (PDF)
(138KB)
States when new NPDES regulations must be used for permits being developed. The memorandum allows use of existing regulations when the regulations become effective after the public notice of a permit.
Date Published:
01/18/1980
- Applicability of Section 301(h) and (i) Modifications to Federal Facilities (PDF)
(239KB)
Legal opinions on the status of federal facilities under the Clean Water Act.
Date Published:
09/12/1978
- Application Requirements for Modification Under Sections 301(c) and 301(g) of the Clean Water Act (PDF)
(301KB)
A memo concerning a possible problem in the regualtions for timing of submittal of requests for modifications under Sections 301(c) and 301(g) of the Clean Water Act.
Date Published:
12/29/1982
- Asbestos Limits in NPDES Permits (PDF)
(305KB)
Suggested approach for including permit limits for asbestos.
Date Published:
10/15/1976
- BCT Cost Test Guidance
The Clean Water Act requires a candidate BCT treatment to be compared to treatment by publicly owned treatment works (POTWs) on the basis of coast of effluent reductions for conventional pollutants. This guide includes the EPA's methodology for making the comparison between these POTWs removal costs for conventional pollutants and industrial removal costs.
Date Published:
09/30/1980
- Calculation of Production-Based Effluent Limits (PDF)
(323KB)
Clarification on the procedure for calculating production-based effluent limitations and to provide guidance on the use of alternate limitations.
Date Published:
12/18/1984
- CERCLA Reporting Requirements for Releases of Ethylene Glycol from Airplane De-icing Operations (PDF)
(374KB)
Expresses EPA's position on the applicability of the federally permitted release exemption and the continuous release reporting regulation to releases of ethylene glycol from airplane de-icing operations.
Date Published:
02/04/1992
- Certification and Permitting of Dischargers Located on Water Forming Boundaries between States (PDF)
(795KB)
Information on permitting and dischargers on water boundaries between states. Legal memorandum stating that the state in which the discharge is located is the state authorized to make a 401 certification.
Date Published:
04/19/1978
- Clarification of OGC Opinion No. 40 (State Review Authority) (PDF)
(118KB)
Legal memorandum clarifying that states have the same authority as EPA Regions in considering the economic impact of technology based effluent limits, when establishing these limits using best professional judgement.
Date Published:
02/04/1977
- Clarification of Sampling Procedures for the VOA Fraction (PDF)
(86KB)
The Permits Division has received several inquiries about sampling procedures when data on volatile organic (VOA) toxic pollutants are required.
Date Published:
07/31/1985
- Combined Sewer Overflows Guidance For Monitoring and Modeling
Provides guidelines for the use of monitoring and modeling in the development and implementation of a CSO control program. The document provides information on characterizing a combined sewer system, assessing the impact of wet weather on CSO discharges, and assessing the impact of CSOs on receiving water bodies. It focuses on the characterization process described in the CSO Policy and refers to other literature for more in-depth explanations of specific techniques (EPA 832-B-99-002).
Date Published:
01/01/1999
- Confidentiality of NPDES Permit Application
Legal decision that NPDES permits and permit applications are public documents and not subject to confidential business information requirements.
Date Published:
04/06/1978
- Consolidated Permit Regulations (PDF)
(338KB)
Suspension of a portion of the definition of the term "waters of the United States" in the Consolidated Permit Regulations pending further rulemaking. 40 CFR Part 122
Date Published:
07/16/1980
- Continuance of NPDES General Permits Under the APA, 1984 (Administrative Procedure Act) (PDF)
(240KB)
General permits can be administratively extended under the Administrative Procedures Act, but expressing that this is not EPA's preferred mode of action.
Date Published:
01/16/1984
- Declaration of Gary W. Hudiburgh, Jr. In the Matter of Star-Kist Caribe, Inc. Petitioner NPDES Permit No. PR 0022012 (PDF)
(407KB)
Information obtained for the Status Report requested by Judge McCallum, and the process used to obtain such information.
Date Published:
04/03/1992
- Delegation (to the regions) of Updates to Major/Minor Lists (PDF)
(94KB)
Memorandum which establishes the delegation of determinations of major/minor status for both municipal and non-municipal NPDES dischargers to the Regions
Date Published:
02/06/1995
- Detection Limits for Total Residual Chlorine
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Letter discussing EPA's determination that chlorine may be reliably measured below 0.1 mg/l in municipal effluents; whether pretreatment program regulations require municipalities to investigate sources of test interference and eliminate matrix interferen
Date Published:
03/21/1994
(This file is not currently available for download)
- Determining Whether Revisions to State NPDES Programs Made To Authorize The Issuance Of General Permits Are Substantial (PDF)
(127KB)
Revisions to state NPDES programs.
Date Published:
02/21/1981
- Draft Interim Guidance on Implementation of Section 402(o) Antibacksliding Rules for Water Quality-Based Permits (PDF)
(1,000KB)
Interim guidance on interpreting Clean Water Act section 402(o) for water quality based effluent limits, and clarifying that the January 4, 1989, regulation interprets the Act for technology based effluent limits.
Date Published:
09/29/1989
- Effluent Trading in Watersheds (WORDPERFECT)
(26KB)
Policy statement communicating EPA policy on effluent trading.
Date Published:
01/01/1996
- Enforcement Policy and the Use of Enforcement Compliance Schedule Letters (ECSLs) for Publicly Owned Treatment Works (POTWs) (PDF)
(179KB)
Information on the EPA municipal dischargers. Clarifies that enforcement compliance schedule letters are only applicable to certain POTWs.
Date Published:
06/22/1977
- EPA Guidance on Application of State Mixing Zone Policies in EPA-Issued NPDES Permits (WORD)
(33KB)
The purpose of this memorandum is to transmit the Office of Water's Guidance on Application of State Mixing Zone Policies in EPA-Issued NPDES Permits.
Date Published:
08/06/1996
- Establishment of RCRA "Program Implementation Guidance System (PIGS)" (PDF)
(795KB)
Establishment of a system to provide directives regarding program implementation.
Date Published:
10/03/1980
- Ex Parte Contacts in Adjudicatory Hearings
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Limits contact among EPA employees involved in preparing and issuing NPDES decisions, and persons outside EPA.
Date Published:
06/16/1978
(This file is not currently available for download)
- Ex Parte Contacts in EPA Rulemaking (PDF)
(117KB)
Memorandum which sets forth the guidelines that all EPA employees should follow in discussing the merits of proposed rules with interested persons outside the Agency during the period between proposal and promulgation.
Date Published:
08/04/1978
- Example Language for Modifying NPDES Permits for Pretreatment Approval (PDF)
(1,420KB)
Guidance to permit authorities on what language to include in NPDES permits to require a POTW to administer a pretreatment program.
Date Published:
09/22/1983
- Fecal Coliform Bacteria Limits (PDF)
(201KB)
This guidance is intended to simplify the procedure for assigning effluent limitations for indicator organisms so that a transition from effluent based to water quality based requirements will be both efficient and effective.
Date Published:
02/14/1977
- Federal Register (FR) Publication Requirements for Draft and Final General NPDES Permits (PDF)
(234KB)
Format requirements for NPDES permits.
Date Published:
01/16/1984
- Federal Register Publication Costs of EPA-Issued General NPDES Permits (PDF)
(153KB)
Minimum statutory and regulatory public notice requirements for issuing draft and final general permits.
Date Published:
04/04/1983
- Final Procedures for the Review of Draft and Final General NPDES Permits (PDF)
(196KB)
Final review procedures for draft and final general NPDES permits.
Date Published:
09/27/1983
- Final Watershed Protection Framework Document (PDF)
(1,000KB)
Memorandum explaining the Office of Water approach for implementing a watershed approach.
Date Published:
10/28/1991
- General Permit Program Guidance
Centralized source of information about the general permit process.
Date Published:
03/01/1988
- Guidance and Standards for Calculating Point Source Pollutant Loads Using the Permit Compliance System (PCS) Point Source Load Reductions as an Indicator of Water Quality Improvements (PDF)
(1,178KB)
PCS is the primary repository of data used to determine reductions in pollutant loads to the waters of the United States. This effort falls under the umbrella of EPA's National Goals Project, which has developed a series of milestones for measuring improvements to the waters ofthe United States over the next 10 years. Measuring point source load reductions using PCS is one way to monitor improvements. The purpose of this guidance is to establish guidelines for consistent coding of NPDES permits in a manner that facilitates load reduction estimation through the use of PCS.
Date Published:
08/01/1997
- Guidance Manual for Developing Best Management Practices (BMP) (PDF)
(16,148KB)
Guidance for NPDES permittees in the development of BMPs for their facilities to prevent release of toxic and hazardous chemicals (EPA 833-B-93-004).
Date Published:
10/01/1993
- Guidance Manual for Reporting and Evaluating POTW Noncompliance
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Guidance to EPA regions and states on criteria for evaluating the principal POTW activities that are essential to fully implement most local pretreatment programs.
Date Published:
04/16/1987
(This file is not currently available for download)
- Guidance on Use of Seasonal Limits in NPDES Permits (PDF)
(454KB)
Letter outlining EPA's guidance of the appropriate use of NPDES effluent limits that vary with the seasons.
Date Published:
09/20/1996
- Implementation of Section 403 of the FWPCA (PDF)
(61KB)
Information from the National Wildlife Federation on Section 403 of the FWPCA. Clarifies that ocean discharge regulations at 40 CFR 227 no longer apply to discharges to oceans, and that the criteria in CWA section 403(c) must instead be used.
Date Published:
07/20/1977
- Incorporation of Pretreatment Program Development Compliance Schedules Into POTW NPDES Permits (PDF)
(333KB)
Re-emphasizes the importance of incorporating pretreatment compliance schedules into appropriate permits at the earliest possible time.
Date Published:
01/28/1980
- Industrial Permit Quality Review Procedures Guide, Draft (PDF)
(7,502KB)
Handbook on how to conduct industrial Permit Quality Reviews (PQRs), which were developed in 1983 by the EPA Office of Water Enforcement and Permits. PQR was designed to provide national information on permit contents and program operations. This information is necessary for responses to Congress, developing budget and resource requests, and to identify areas for guidance or training activities.
Date Published:
09/01/1987
- Innovative Technology Extensions Under Section 301(k) of Clean Water Act; Effect of Sections 301(j) and (l) (PDF)
(245KB)
Extensions under section 301(k) of the Clean Water Act. Clarifies the granting of innovative technology extensions for toxic pollutants.
Date Published:
09/06/1978
- Interim Guidance for Performance-Based Reductions of NPDES Permit Monitoring Frequencies (PDF)
(87KB)
Interim guidance to reduce unnecessary pollutant-specific monitoring and reporting in reissued NPDES permits with an excellent compliance and enforcement history. Does not advocate reductions for parameters monitored only once per quarter or for limits below analytical level of quantification (EPA 833-B-96-001).
Date Published:
04/01/1996
- Interim Strategy for the Regulation of Pulp and Paper Mill Dioxin Discharges to the Waters of the United States (PDF)
(511KB)
Interim strategy for the regulation of pulp and paper mill dioxin discharges.
Date Published:
08/09/1988
- Judicial Officer's Decision on Part 124 Proceedings (PDF)
(654KB)
Guidance that when both legal and factual issues arise in an evidentiary hearing, and the EPA region grants the hearing on the factual issues, that the legal issues must also be heard by the administrative law judge.
Date Published:
04/12/1985
- Letter to Mr. John C. Hall and Associates (PDF)
(1,545KB)
Letter to Mr. John C. Hall of Hall & Associates from EPA's James Pendergast regarding total residual chlorine detection limits.
Date Published:
08/11/1998
- Letter to Mr. Robert Bedell (PDF)
(280KB)
Letter to Mr. Robert Bedell, Deputy Administrator, Office of Management and Budget, from Bruce R. Barrett, EPA regarding exemption from review requirements of EO 12291 for NPDES General Permits.
Date Published:
08/08/1983
- Major Municipal Permitting in FY 81 (PDF)
(186KB)
Memorandum requesting priority on issuing permits to municipalities rather than industries for fiscal year 1981.
Date Published:
07/10/1980
- Maximum Daily Discharge Limitations vs. Instantaneous Maximum Limitation (PDF)
(75KB)
Letter recognizing the distinction between maximum daily discharge limitations and instantaneous maximum limitations.
Date Published:
10/23/1998
- Memorandum: Compliance Schedules for Water Quality-Based Effluent Limitations in NPDES Permits (PDF)
(3 pp, 56KB)
Memo from Jim Hanlon, discussing compliance schedules for water quality-based effluent limitations in NPDES permits.
Date Published:
05/10/2007
- National Minor Permit Issuance Strategy (PDF)
(771KB)
Strategy aimed at reducing the minor permit backlog.
Date Published:
02/20/1986
- National Municipal Policy & Strategy For Construction Grants, NPDES Permits, and Enforcement Under the Clean Water Act (PDF)
(2,000KB)
Policy for assuring POTWs implement secondary treatment as quickly as possible.
Date Published:
10/01/1979
- New NPDES Non-Municipal Permit Rating System (PDF)
(3,000KB)
Memorandum which discusses the implementaion of the new system for rating dischargers as major/minor for purposes of aiding the administration of the NPDES program.
Date Published:
06/27/1990
- New Policies for Establishing and Implementing Total Maximum Daily Loads (TMDLs) (PDF)
(661KB)
Memorandum expressing EPA's policies for developing and implementing TMDLs.
Date Published:
08/08/1997
- New Regulations Governing the Discharge of Toxic and Hazardous Pollutants to POTWs (PDF)
(597KB)
Permitting and compliance monitoring & enforcement implementation activities.
Date Published:
12/17/1990
- Ninth Circuit Court Decision Regarding 304(1) Implementation (PDF)
(1,539KB)
Interpretation of court decision regarding 304(1) implementation.
Date Published:
10/25/1990
- NPDES Evidentiary Hearing Management Program (PDF)
(491KB)
Procedures for evidentiary management program.
Date Published:
10/03/1980
- NPDES Permit Authorization to Discharge (PDF)
(145KB)
Information on the request of whether an NPDES Permit constitutes an authorization to discharge only specific parameters limited or monitored in the permit of a general authorization.
Date Published:
04/28/1976
- NPDES Permit Form (PDF)
(711KB)
Memorandum outlines prescribed form for NPDES permits. Information on content and layout of forms to be utilized for all industrial and most other non-municipal dischargers.
Date Published:
09/18/1973
- NPDES Permit Issuance Flexibility Policy in Watershed Permitting (PDF)
(223KB)
Memorandum to the Regions recognizing the challenge involved with respect to meeting permit issuance requirements during the transition to the watershed approach. It outlines measures designed to facilitate with the transition.
Date Published:
03/13/1996
- NPDES Permit Writers Guide on Data Quality Objectives (PDF)
(3,881KB)
Process that should be followed for establishing Data Quality Objectives.
Date Published:
12/03/1990
- NPDES Permits and Requirements of State Law (PDF)
(171KB)
NPDES permits to federal facilities must conform with state water quality management plans, but that the permits do not need to be immediately modified to include recent revisions to such plans.
Date Published:
05/04/1977
- NPDES Permits in Wetlands Areas
Information on the guidance concerning the creation of a sanitary landfill in a wetland.
Date Published:
07/11/1977
- NPDES Permitting Strategy for OCPSF Industry Direct Dischargers (PDF)
(3,000KB)
National strategy calling for expeditious reissuance of NPDES permits for organic chemical facilities, in order that the new effluent guidelines can quickly become implemented.
Date Published:
02/16/1989
- Office of General Counsel (OGC) Memorandum (PDF)
(332KB)
Legal opinion concerning the inclusion of compliance schedules in Second Round and new permits.
Date Published:
01/19/1979
- Office of Water Policy and Technical Guidance on Interpretation and Implementation of Aquatic Life Metals Criteria (PDF)
(2,924KB)
Policy memorandum on how EPA will interpret its national criteria for metals, and presentation of technical tools states and EPA regions can use in implementing these criteria in NPDES permits and TMDLs.
Date Published:
10/15/1993
- OMB Decision to Not Review All NPDES General Permits
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Letter from OMB agreeing to exempt from OMB review general permits, conditioned upon ability to withdraw exemption for any particular permit.
Date Published:
11/03/1983
(This file is not currently available for download)
- Order Denying Modification Request with Respect to the Administrator's 1990 Decision in Star-Kist Caribe, Inc. (NPDES Appeal No. 88-5) (PDF)
(1,477KB)
Memorandum to EPA regions explaining the effect of the Administrator's decision regarding compliance schedules in EPA issued permits. (NPDES Appeal No. 88-5)
Date Published:
05/27/1992
- OW's Consultation of NPDES Permits for Solid Waste Discharge (MOA with Army) (PDF)
(432KB)
Memorandum to EPA regions requesting EPA Headquarters involvement in discussions related to discharge of NPDES residuals into wetlands
Date Published:
02/01/1987
- Permit Compliance System (PCS) Policy Statement (PDF)
(778K)
Policy requiring EPA regional and state use of PCS for storage of NPDES information.
Date Published:
10/31/1985
- Policies for Reissuing Industrial NPDES Permits (PDF)
(315KB)
Policies and guidance on industrial NPDES permits.
Date Published:
07/12/1978
- Policy Statement on Scope of Discharge Authorization and Shield Associated with NPDES Permits (PDF)
(332KB)
EPA's position on the scope of the authorization to discharge under an NPDES permit and the shield thus associated with the permit authorization.
Date Published:
07/01/1994
- Procedures for Issuance of Enforcement Compliance Schedule Letters (PDF)
(388KB)
Information on enforcement compliance schedule letters (ECSL).
Date Published:
06/03/1976
- Procedures for Processing Fundamentally Different Factor Variances (PDF)
(215KB)
Questions have recently been raised concerning the procedures for processing fundamentally different factors (FDF) variances. The NPDES regulations at 40 CFR 124.62-124.63 contain the procedures for processing variances. A copy of these provisions is attached.
Date Published:
06/01/1983
- Procedures for Revising the Major Permit List (PDF)
(110KB)
Clarification of requirements for municipal and industrial dischargers.
Date Published:
12/28/1988
- Promulgation of regulations implementing section 301(j), 301(c), and 301(g) waivers.
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Notification that EPA has promulgated regulations implementing section 301(j), 301(c), and 301(g) waivers, and clarification that only EPA can grant these waivers.
Date Published:
09/12/1978
(This file is not currently available for download)
- Proper Application of Chlorine Criteria to Develop National Pollutant Discharge Elimination System (NPDES) Permit Limitations for Publicly-Owned Treatment Works (POTWs). (PDF)
(246KB)
Letter explaining the proper application of chlorine criteria to develop National Pollutant Discharge Elimination System (NPDES) permit limitations for publicly-owned treatment works (POTWs).
Date Published:
02/03/1998
- Public Notice of Tentative Section 301(g) Decisions and Draft NPDES Permits (PDF)
(307KB)
Reminder to states and Regional Offices of the proper procedures for public notice of draft NPDES permits while section 301(g) variance decisions are pending.
Date Published:
08/01/1985
- Questions and Answers on Implementation of Section 304(1) of the Clean Water Act (PDF)
(816KB)
Provides answers to miscellaneous questions about implementing section 304(l) of the Clean Water Act.
Date Published:
01/04/1990
- Questions Regarding the Policy and Procedures for Enforcement Compliance Schedule Letters, (PDF)
(460KB)
Information on the June 3, 1976 issue with the enforcement actions against municipal and industrial dischargers failing to meet the July 1, 1977 statutory deadlines and procedures for issuing enforcement Compliance Schedule Letters (ECSL's).
Date Published:
12/10/1976
- RCRA Permit Priorities Guidance (PDF)
(62KB)
Priorities for processing RCRA permits.
Date Published:
10/03/1980
- Recent Concerns about USGS Data for Selected Metals (PDF)
(261KB)
Use of data for establishing NPDES permit limits.
Date Published:
01/02/1992
- Recent Environmental Appeals Board Decision (PDF)
(1,000KB)
Memorandum explaining that the decision of EPA's environmental appeals board upheld an EPA issued permit limit for whole effluent toxicity.
Date Published:
10/07/1993
- Regional Guidance for Development of State-by-State Watershed Protection Assessment and Action Plans (PDF)
(1,933KB)
Guidance document to provide assistance to EPA regions in preparing state-by-state assessments and action plans.
Date Published:
05/10/1994
- Regional Review of State-Issued NPDES Permits (PDF)
(125KB)
Clarification on review of NPDES permits.
Date Published:
01/18/1980
- Reissuing NPDES Permits to Sources Affected by the NRDC Consent Agreement (PDF)
(243KB)
Guidance on reissuing permits.
Date Published:
05/16/1978
- Representative Sampling in NPDES Permits (PDF)
(132KB)
Expresses importance of clear expressions of monitoring locations in NPDES permits, and offering recommended permit language for such.
Date Published:
05/06/1983
- Request for Legal Opinion - Inclusion of Compliance Schedules in Second Round and New Permits
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Legal opinion allowing the use of compliance schedules for revised BAT and water quality standards. [Note: This is modified by Starkist Caribe decision of 1990.]
Date Published:
12/26/1978
(This file is not currently available for download)
- Results of Significant Noncompliance (SNC) Study (PDF)
(179KB)
Significant noncompliance study and enforcement of EPA regulations.
Date Published:
08/25/1993
- Review of Memorandum Regarding Draft Procedures for Processing Fundamentally Different Factors Variances for Direct and Indirect Dischargers (PDF)
(899KB)
Proposed procedures on variances and time extensions available under the Clean Water Act.
Date Published:
10/11/1983
- Review of State NPDES Permits Written Prior to State Program Revision (PDF)
(202KB)
Applicability of certain requirements contained in the consolidated permit regulations.
Date Published:
12/24/1980
- Revised NPDES Second Round Permits Policy (PDF)
(690KB)
Policy establishing five priorities for permit issuance, and requiring permit issuance by September 30, 1983. Revision to policy for issuing permits that implement BAT. [Note: This policy was later revised and expired September 30, 1983.]
Date Published:
06/02/1982
- Revised Policy Statement on Scope of Discharge Authorization and Shield Associated with NPDES Permits (PDF)
(347KB)
Memorandum describing EPA's policy interpretation of Clean Water Act section 402(k), also known as "permit as a shield."
Date Published:
04/11/1995
- Section 301(g) Variance Requests (PDF)
(287KB)
Guidance for handling 301(g) variance requests.
Date Published:
05/17/1983
- Sewage Disposal from Trains (PDF)
(125KB)
Clarifies that sewage disposal from trains is best addressed by the Rail Passenger Service Act, and not the Clean Water Act.
Date Published:
11/08/1988
- Signatories to Department of Defense Permit Applications (PDF)
(417KB)
Memorandum identifying who must sign permit applications submitted for Department of Defense facilities, including NPDES permits.
Date Published:
01/25/1985
- State General Permit Program Development (PDF)
(7,113KB)
Guidance document provides a centralized source of information about the general permit process and obtaining general permit authority.
Date Published:
06/13/1989
- State Regulation on Federal Facilities under the Federal Water Pollution Control Act Amendments of 1977 (Clean Water Act) Policy Guidance Memorandum (PDF)
(446KB)
Information on the recent amendments to the FWPCA.
Date Published:
03/10/1978
- Statement by Agency Personnel Purporting to Sanction Source Actions Which Are Inconsistent With Statutory Requirements
Publication is not available electronically. For more information on ordering publications, go to http://www.epa.gov/owm/inpub.htm.Restates EPA's policy that employees cannot make formal or informal commitments to refrain from taking enforcement action or sanction activities that violate statutory or regulatory requirements administered by EPA.
Date Published:
05/28/1980
(This file is not currently available for download)
- Status Report in the Matter of Star-Kist Caribe, Inc. Petitioner NPDES Permit No. PR0022012 (PDF)
(329KB)
Steps Petitioner and the Office of Water have taken to address implementation of September 4, 1990 Stay Order.
Date Published:
04/03/1992
- Statutory Deadlines for Compliance by Publicly Owned Treatment Works under the Clean Water Act (PDF)
(345KB)
Memo regarding statutory deadlines affected by the amendments to the CWA
Date Published:
03/04/1983
- Stay Granted in Star-Kist Caribe (PDF)
(370KB)
Stay of order on petition for reconsideration.
Date Published:
09/21/1990
- Suspension of Consolidated Permit Regulation Establishing Criteria for NPDES New Source Determinations and Proposed Revision of the Regulation (PDF)
(89KB)
Announcement of suspension of NPDES regulations pertaining to new sources, and proposal of revision. [Note: This memorandum is obsolete when the changes were promulgated on September 26, 1984.]
Date Published:
09/25/1980
- Suspension of Portion of Definition of "Waters of the United States" in Consolidated Permit Regulations - Action Memorandum (PDF)
(79KB)
Suspending a provision of the Consolidated Permit Regulations.
Date Published:
07/15/1980
- Training Manual for NPDES Permit Writers
Illustratation of the application of technical principles of the NPDES regulations. Table of contents only (EPA-833-B-93-003).
Date Published:
05/01/1987
- Transfer of Authority Over Federal Facilities to NPDES States - Guidance Memorandum (PDF)
(218KB)
Guidance on authorizing states to issue NPDES permits to federal facilities. Uniform method for processing transfers of authority.
Date Published:
11/28/1978
- Use of Enforcement Compliance Schedule Letters Past July 1, 1977 (PDF)
(112KB)
Expands upon previous memoranda on this subject regarding use of enforcement compliance schedule letters issued after July 1, 1977.
Date Published:
05/11/1977
- Utility Manholes and Vaults as "Point Sources" (PDF)
(274KB)
Letter to Senator Reid on whether utility manholes and vaults are point sources of pollution under the CWA.
Date Published:
09/04/1997
- Waters of the United States Determination For a Proposed Cooling Pond Site in Polk County, Florida (PDF)
(416KB)
Proposed cooling pond site in Polk County, Florida. Provides guidance on whether a cooling pond is considered as a water of the US under the NPDES permit program.
Date Published:
12/13/1993
- Writing NPDES BAT Permits in the Absence of Promulgated Effluent Guidelines (PDF)
(661KB)
Expresses need to reissue NPDES permits implementing BAT although effluent guidelines have not been developed, and initial guidance on how to write such permits using best professional judgement.
Date Published:
06/25/1980
|
|
| |
|
 |
You will need Adobe Reader to view some of the files on this page. Files are best viewed in Internet Explorer and Adobe 8.0 or higher. See EPA's PDF page to learn more.
|
|