Snagging and Clearing for Flood Control (CAP Section 208)
|
Work under this authority provides for local protection from flooding by channel clearing and excavation, with limited embankment construction by use of materials from the clearing operation only. The non-Federal sponsor is responsible for a minimum of 35% to a maximum of 50% of total project costs and the Federal Government is responsible for the remainder of total project costs. The Federal share of planning, design, and construction cannot exceed $500,000 for each project |
$478,000
|