Ensures that EPA Regions scrutinize all proposed plans, draft and final RODs, post - ROD documents which address institutional controls to verify that they adequately document the objectives of the ICs.
This document provides guidance to the EPA on the exercise of EPA's discretion under CERCLA section 120(h)(3)(A),(B), or (C) when EPA is called upon to evaluate institutional controls as part of a remedial action.