Clean Energy
This application is specifically recommended for use with (and has been tested with) Mozilla Firefox and Microsoft Internet Explorer browsers. The application works, with minor appearance differences, on Netscape, Chrome, Safari, and other browsers.
You can switch between years for power plant (and the groups of boilers and generators in a plant), State, eGRID subregion, NERC region, and the U.S.
You cannot switch between years for a plant's individual boiler to boiler, individual generator to generator; or for EGC, parent companies, or power control areas.
You can switch between EGC Location (Operator)-based and EGC Owner-based, as well as between Parent Company Location (Operator)-based and Parent Company Owner-based for companies.
Download Help document (contains all of the online Help information) - eGRIDwebHELP.zip
Click the following categories to view the related FAQs:
Download FAQs document (contains all of the online FAQs) - eGRIDwebFAQs.zip
Download Technical Support Document (TSD) - eGRID2007TechnicalSupportDocument.zip
eGRIDweb version 1.0, 2009.
Developed for the U.S. EPA / Climate Protection Partnerships Division / State and Local Climate and Energy Program.
For eGRIDWeb feedback, please contact us at eGRIDweb@pechan.com.